Safer Wafers

Industra Inc. automates fab clean roomcontrol.

Jim Stewart and Jeff Tilleman, P.E. -- Control Engineering, 12/15/1998

With demand for semiconductor wafers exceeding manufacturing capacity, Integrated Device Technology (IDT, Hillsboro, Ore.) rushed to construct a new submicron, Class 1 fabrication facility or "fab." In the meantime, the company spent $30 million to upgrade a 10-year-old facility to boost production while waiting for completion of the new plant. In addition to speedy construction, IDT also needed to stay within its $1,750/square-foot budget— significantly lower than the average $4,000/square-foot cost of a new fab. To help meet cost and speed constraints, without compromising cleanroom specifications, IDT contacted project integrator, Industra Inc. (Portland, Ore.) to develop and install an automated monitoring and control system from GE Fanuc Automation (Charlottesville, Va.).

Strict cleanroom specifications have the potential to complicate and lengthen new fab construction as well as mire production and escalate downtime in the completed facility. To prevent this, Industra installed the system within a tight nine-month deadline. Early in the project, IDT and Industra debated control architecture and the number of GE Fanuc Series 90-30 PLCs. Due to the short construction schedule, the control team decided that a common panel design would be the fastest and least expensive to build. Industra designed a single panel with space for three CPUs and issued fabrication drawings to the panel shop one week after project kickoff. The fast-track schedule forced early decisions on panel placement, I/O layouts, and I/O assignments.

Industra implemented the facility controls on a staggered schedule. Temporary equipment was installed when deliveries did not meet construction deadlines. Construction focused on dividing the cleanroom into "zones" and bringing them online in a designated sequence. This required the facility energy center to be online early, and air handlers, make-up air handlers, terminal units, and cleanroom modules were to be commissioned in a parallel schedule. After installing the first bay's equipment and instrumentation, the team completed subsequent zones in quick succession. Checkout and commissioning occurred in one area while installation took place in another. Startup was handled system by system.

After all systems were running, technicians set up the facility with preliminary tuning. The control system permits modifications and refinement as the fab continues to grow and change. This meant that during each construction phase, screens for Cimplicity HMI—the supervisory control and data acquisition (SCADA) software used in the project—could be developed on the fly. If a problem occurred during expansion, the team then modified the control screens to accommodate more data or control points to solve the problem.

Today, the GE Fanuc monitoring and control system has scaled up to encompass every control function in the facility. Along with reliability and scalability, economy has also been realized. The cost of installing the system was one-third the expense of a conventional distributed control installation. The original project was estimated at $1,200 per I/O point, including hardware, software, installation, and engineering. This initial investment has yielded returns to make the IDT Winfab one of the most cost-effective, competitive fabs in the Pacific Northwest.

Comments? Send e-mail to: mdrakulich@cahners.com

For more information on GE Fanuc, for Industra, visit www.controleng.com/info


Author Information
Jim Stewart, director of site services, Integrated Device Technology Inc. (Hillsboro, Ore.) and Jeff Tilleman, P.E., project engineer, Industra Inc. (Portland, Ore.)

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Related Content

Related Content

 

By This Author

There are no other articles written by this author.

Sponsored Links

 

Advertisement
SPONSORED LINKS

More Content

  • Blogs
  • Discussions
  • Webcasts
  • Podcasts
  • Videos

Blogs

  • Paul Grayson
    AIMing for Automated Vehicles

    November 18, 2008
    Back To Basics - vehicle control
    BASIC AUTOMOTIVE CONTROL Human drivers are the weak link in the transportation system. Driver fatigue is responsible for as many as 240,0......
    More
  • Matt Luallen and Steve Hamburg of Encari
    Industrial Cyber Security

    November 17, 2008
    NIST SP 800-82 Guide to Industrial Control Systems Security
    The National Institute of Standards and Technology has posted the Final Public Draft of NIST SP 800-82, Guide to Industrial Control Systems (ICS) S......
    More
  • View All BlogsRSS

Discussions

  • EtherNet/IP Drivers (posted by gr8kr)

  • EtherNet/IP Drivers (posted by gr8kr)

  • OPC (posted by MAHESH)


  • Source: Control.com, the global online discussion community for automation professionals.

    Webcasts

    Engineering-driven Ethernet
    This Control Engineering Roundtable Webcast will address the engineering issues you should be aware of when exploring the adoption of Ethernet or when looking to expand its use in your facility.

    Bridging gaps with wireless
    Discover how you can create stronger, flexible and cost-effective wireless connections for your entire plant. Register today!

    View All Webcasts
    Advertisements





    NEWSLETTERS

    Get engineering industry news, trends, and business-critical information delivered directly to your inbox!

    Click on a title below to learn more.

    Weekly News (Weekly)
    Process Instrumentation & Sensors (Monthly)
    System Integration Monthly (Monthly)
    Process & Advanced Control (Monthly)
    Machine Control (Monthly)
    Information Control (Monthly)
    Automation Control (Monthly)
    Product Review (Monthly)
    Simplified Safety
    Fieldbus Facts
    PROFInews North American Edition
    About Us   |   Advertising Info   |   Site Map   |   Contact Us   |   Useful Sites   |   FREE Subscription   |   RSS
    © 2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
    Use of this Web site is subject to its Terms of Use | Privacy Policy
    Please visit these other Reed Business sites