Control panel design: Easier access

Panel interface connectors decrease risk, allow PLC or PAC access without opening the control panel.

Lynne Keener

04/06/2012


Panel interface connectors decrease risk, allow PLC or PAC access without opening the control panel.The industrial control panel, containing network equipment and programmable automation controllers, is central to operations. Having access to these controls on a routine basis is required for production management and manufacturing execution system (MES). However, accessing this equipment requires precautions necessary for safety and regulatory compliance.

One of the issues with control panel access is the risk of arc flash. Arc flash occurs when there is a release of energy caused by an electric arc. This arc flash creates a blast that within a few milliseconds reaches several thousand degrees Celsius and in turn causes severe burns and often death.

OSHA, in hand with NFPA 70E standards, requires anyone opening control cabinets to have training and wear protective gear. The requirements also include planning and assessment of hazard potential as well as area marking to include protective boundaries and warning labels. Needless to say, these efforts add up to a lot of time and money.

An alternative involves the use of a pass-through to access the automation controllers. Panel interface connectors (PICs) or access ports enable a user to test and maintain equipment without opening the panel. This arc mitigation solution alleviates the need for personal protection equipment (PPE) and the need for a trained electrician to de-energize the system.

Panel interface connectors mount to the outside of the control panel. A typical PIC will contain a power supply (single, duplex, GFCI) and one or more connectors commonly used for programmable devices.  These connectors include D-Sub, RJ45/Ethernet, USB, DeviceNet, and others. Often there will be a 3-amp reset as well.

While there are situations when a system needs to be shut down for full access, using a PIC saves time and money and allows for testing and maintenance in an energized state. Making adjustments to equipment and network systems and having the ability to monitor changes in short order is a huge time savings.

- Lynne Keener is marketing coordinator at Mencom. Edited by Mark T. Hoske, content manager, Control Engineering.

www.Mencom.com 

Founded in 1987, Mencom Corporation, located in Oakwood, Ga., provides industrial electrical connectors. Mencom is among the last remaining manufacturers of U.S.-made electrical cordsets.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Nominate today - Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Device diagnostics drive improved plant performance, Machine vision, Stepper motor systems
Robotic innovations, safety, Industrial energy management, Lambda tuning for PID, HMIs: All about software
CNC Way beyond traditional; Remote I/O, new approaches; Inside Process: APC, PID, cyber-security
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

CFEMedia.com | Subscribe to Magazine | Advertise | Contact Us | About Us | Site Map | Privacy Policy
Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.