Data center is solidly grounded

Syska Hennessy Group designed a data center that required solidly grounded underground duct banks.

05/16/2013


Recently, Syska Hennessy Group led the design of a large data center that required a 25 kV utility service, solidly grounded, in underground duct banks. The service was 25 kV, 100% insulation level, copper conductors with ethylene propylene rubber (EPR) insulation.

The facility has an on-site 25 kV/13.2 kV substation to supply a 13.2 kV distribution system in underground duct banks. The system is impedance grounded and can be operated with one phase grounded for an unlimited time. When design engineers couldn’t find a cataloged 15 kV class cable with 173% insulation level, Syska used a 25 kV-class cable with 100% insulation level, copper conductors, and EPR insulation. The data center’s electrical infrastructure 600 V class facility distribution system was designed solidly grounded in overhead conduits and includes the following:

  • 600 V class copper conductors with thermoplastic high heat nylon (THHN) insulation
  • 600 V class facility distribution system, solidly grounded, in underground duct banks
  • 600 V class copper conductors with rubber high heat waterproof (RHHW-2) insulation
  • 600 V class plug-in bus ducts with copper conductors for distribution to IT equipment cabinets
  • 600 V class feeder bus duct with copper conductors for maintenance bypass and load bank circuits that are only occasionally used
  • 600 V class cable bus with copper conductors for large capacity feeders in the critical distribution system.

 

Christopher M. Johnston is a senior vice president and the chief engineer for Syska Hennessy Group's critical facilities team. Johnston specializes in the planning, design, construction, testing, and commissioning of mission critical 7x24 facilities, and leads team research and development efforts to address current and impending technical issues in critical and hypercritical facilities. With more than 40 years of engineering experience, he has served as quality assurance officer and supervising engineer on many projects.



Anonymous , 06/11/13 08:36 PM:

If the 13.2kv system is ungrounded you need only a 133% cable insulation. When the system is high impedance grounded why use a 173% cable insulation? Should the 133% insulation suffice?
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.