EDDL standard: Support for latest enhancements

Electronic Device Description Language standard for integrating intelligent devices with automation systems receives support from HART Communication Foundation (HCF).

03/15/2011


HARHART EDDLT Communication Foundation announces support for the latest enhancements to Electronic Device Description Language (EDDL) incorporated in the second edition of the International Electrotechnical Commission’s IEC 61804-3 standard. EDDL is the key industry standard for integrating real-time diagnostic and asset management information from millions of intelligent field devices for optimum data and device interoperability with automation systems.

“The latest improvements to the EDDL standard benefit users throughout the process automation industry. Devices continue to get more sophisticated and EDDL makes them easier to use, transforming data into information so users can take full advantage of intelligent instrumentation,” says Ron Helson, HART Communication Foundation Executive Director. “The EDDL standard delivers unparalleled ease of use, stability and backward compatibility for industrial automation – ensuring that existing DDs are protected and users have a continuous forward migration path with no investment loss.”

Recent improvements to the EDDL standard enhance the integration of intelligent devices with automation systems, specifically:

  • support for offline configuration with default parameter values suggested by the device manufacturer to simplify and speed device commissioning;
  • support for Unicode character sets, enabling parameter labels, diagnostics, and device manufacturer expert help text to be displayed in many different languages including Chinese, Japanese, Russian, etc.;
  • ability to display all device diagnostics and setup information with rich user friendly graphics for easier and faster completion of commissioning and maintenance tasks;
  • new capabilities to support the display of illustrations based in user preferred language, such as images with explaining text to convey know-how from the manufacturer for help in the interpretation of advanced diagnostics, guide setup and for troubleshooting.

A key element of the HART Communication Protocol since 1990, EDDL is the HART standard and the only technology endorsed by the HART Communication Foundation for configuration, set-up, maintenance and support of HART-enabled devices. With these new enhancements: the EDDL standard remains backward compatible and stable for the long life cycle needs of industrial automation; installed devices and systems remain compatible; EDDL files load and perform on systems in the same way; and updates continue without the problems of executable software.

EDDL is a text-based language standard to describe the unique characteristics of intelligent field devices for integration with systems. The HART Communication Protocol was the first to implement EDDL, enabling suppliers to define their products in a single, open and consistent format readable by the multitude of host applications required by industry including handheld communicators, control systems, PCs and other process interface devices.

www.hartcomm.org

HART Communication Foundation

- Edited by Gust Gianos, Control Engineering, www.controleng.com



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.