How often should PM strategies and tasks be reviewed?

The question is often asked "how often should PM strategies and tasks be reviewed?" Here are 3 processes an organization should have in place to support PM reviews.

Tracy Strawn, Marshall Institute

06/29/2012



The question is often asked "how often should PM strategies and tasks be reviewed?" Here are three processes an organization should have in place to support PM reviews.

1. Root cause analysis (RCA) review: Each time an RCA is performed on failed equipment a review of the maintenance strategy should also be performed. The review of the maintenance strategy including the PM tasks should determine if a task exists that is supposed to prevent or identify early the incipient failure that ultimately led to the failure of the equipment.

If a task exists it should be determined if the task was performed properly. If the task was performed properly then the task should be changed as its ineffective. If the task was not performed properly then training should be provided to so that the task will be performed properly in the future. If no task exists then one should be developed and added to the PM procedure and the maintenance strategy updated.

2. Maintenance tech feedback: Feedback from the maintenance techs can be a valuable source of information. If the maintenance techs provide information or suggestions on how to improve a task it should be reviewed by the technical authority (discipline engineer) to ensure effectiveness.

3. Five-year PMO review: Industry best practice suggests that a formal review of all PM routines should take place every five years. The formal review is sometimes called PM Optimization. This is the minimum requirement in Marshall Institutes estimation.

- Some oil industry maintenance and integrity standards require a review every five years. Of course they use SCRM or derivative of it. Their standards for RCM are less rigorous than some industries like the nuclear power industry.

- John Moubray, author of RCM II, suggests a review every 12-24 months for critical equipment and up to three years for less critical.

- Anthony Smith, author of RCM: Gateway to World-Class Maintenance, recommends a first review at 18-24 months and then every three years after that.

- Steve Turner, well known RCM practitioner from aviation industry, and owner/creator of a preventive maintenance optimization process in Australia recommends minimum every three years.

- The Society of Maintenance and Reliability Professionals in the U.S. recommends every three years.

- Marshall Institute’s experience and observations of companies in industry suggests that a review every five years is the minimum for most equipment and operating contexts.

My key point is that maintenance strategies need to be reviewed periodically. If the organization understands the risks and has history to support their decisions they should be able to determine an acceptable frequency for reviews.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Nominate today - Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Robotic innovations, safety, Industrial energy management, Lambda tuning for PID, HMIs: All about software
CNC Way beyond traditional; Remote I/O, new approaches; Inside Process: APC, PID, cyber-security
Servodrive Control: Precise Power, PLCs vs. PACs, Virtualization, Best Products: Engineers' Choice Awards
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

CFEMedia.com | Subscribe to Magazine | Advertise | Contact Us | About Us | Site Map | Privacy Policy
Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.