Electrical product design

U.S. electrical product specifications are developed in correlation with the NEC. While this can permit a safe electrical installation, it may not address worker safety issues when equipment has to be accessed or maintained after it is commissioned. While product standards are designed to provide guarding from electrical shock, in most cases they may not provide adequate safety from arc flash and arc blast. Once a cover or panel trim is removed, the equipment is not in compliance with the product standards and the worker could be exposed to electrical hazard.

Figure 4: A main circuit breaker is encapsulated so staff is not exposed to energized parts. If a listed and labeled design were approved so that the panel cover could be removed and be classified as de-energized with the main breaker in the panelboard loElectrical distribution equipment could be designed to isolate sections of the equipment in order to permit work on them without exposure to electrical hazards. Consider, for example, an electrical power panelboard. Typically, the main circuit breaker is unguarded and is located in the same compartment as the branch circuit breakers and wiring. If a listed and labeled design were approved so that the panel cover could be removed and be classified as de-energized with the main breaker in the panelboard locked out (see Figure 4), it would permit modifications and additions to the electrical panel in accordance with OSHA regulations. This would be an exceptional benefit for the residential market.

OSHA enforcement regulations forbid compliance officers from approving products or installations. They have to conduct inspections and review products in accordance with their listing and labeling. In the case of a residential panelboard, if there is electrical power on the line side of the main circuit breaker and the main breaker is in the off position, the panelboard is still classified as the worker could be exposed to live parts. Under the listing and labeling criteria, the employer would have to demonstrate that the equipment would be listed and labeled with live power inside and the cover removed. The manufacturers require all trims and covers be installed when there is power above 50 V present. The trims and covers act as guarding from live parts.  

The past 20 years have seen a marked evolution in the electrical industry's awareness of electrical safety issues and increased requirements for electrical safety-related work practices. Building inherently safe design into electrical products for maintenance and modification as well as installation purposes is the next step.

Engineers can design the hazard out of work tasks by specifying electrical products that have enhanced safety features, by specifying products that address both design requirements and operation of the facility, and by incorporating improved installation techniques is a strategy that will not only increase worker safety, but also increase productivity and profits.


Kenneth Mastrullo is president of MES Consulting Services. His many years in the electrical construction industry include: 7 years in OSHA's New England Regional Office (Region I Electrical Technical Expert), 6 years in the NFPA (Secretary, NFPA 70E Electrical Workplace Safety), and 11 years as a facilities engineer.


<< First < Previous 1 2 3 Next > Last >>

No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.