SEARCH Archives
Loading
Sponsored by:

Larger rewinds in less time

GE’s new lower-cost, onsite motor rewind capability claims to help increase plant effectiveness.

08/01/2011


Many plant operators have reportedly experienced difficulties in repairing large motors. In most cases, these critical links in the system have forced entire plants to shut down for several days as they are removed, transported, rewound and reinstalled. The losses in productivity to a company can be significant.

For the last 30 years, GE has offered its onsite GEGARD 400 motor rewind system for motors up to 6,000 volts. Now it is more than doubling the system’s capability – covering motors up to 14,000 volts, regardless of horsepower or motor speed, according to Richard Meng, program manager at GE Energy.

The advantages, says Meng, are the ability to conduct the rewind on-site, at the owner’s plant, to avoid delays in bringing the motor to a repair shop. In addition, he notes, time is also saved by no longer requiring an alternative vacuum pressure impregnation (VPI) process at the repair shop.

“Its flexibility makes it easier to insert coils into stator slots, which helps to further reduce an operator’s downtime,” Meng says. “The GEGARD 400 HV system gives you everything you get with VPI, just faster,” he continues. “It’s built on a proven technology, and it’s been thoroughly tested to rigorous GE standards, passing relevant IEEE and IEC standards with top marks.” 

The new system is reportedly designed for facilities with large ac motors that cannot afford extended downtime. These include utilities, manufacturing, mining, metals, oil and gas, cement, and pulp and paper. It can also be used for synchronous condensers, smaller size generators with higher speeds that are usually difficult to rewind using conventional hard coils.

www.ge.com 

General Electric

- Edited by Chris Vavra, Control Engineering, www.controleng.com



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Nominate today - Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Device diagnostics drive improved plant performance, Machine vision, Stepper motor systems
Robotic innovations, safety, Industrial energy management, Lambda tuning for PID, HMIs: All about software
CNC Way beyond traditional; Remote I/O, new approaches; Inside Process: APC, PID, cyber-security
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.

CFEMedia.com | Subscribe to Magazine | Advertise | Contact Us | About Us | Site Map | Privacy Policy
Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.