Is your machine downtime sometimes a surprise? Did a component in a safety circuit fail because it simply wore out and nobody knew it was about to fail? Well, maybe help has just arrived. Has anyone heard about EN ISO 13849-1; 2008? See "4 ways to reduce surprise downtime."

07/14/2011


JB Titus, CFSEIs your machine downtime sometimes a surprise? Did a component in a safety circuit fail because it simply wore out and nobody knew it was about to fail? Well, maybe help has just arrived. Has anyone heard about EN ISO 13849-1; 2008?

   This new standard (Safety of machinery, Safety-related parts of control systems) has arrived and the Machinery Directive in Europe has established its effective date as Jan. 1, 2012. Since the US is part of the ISO (International Standards Organization) many companies in the US are making plans to or have already adopted this new standard. In my opinion, 13849-1 improves machine safety because it moves machine safety from qualitative Categories to quantitative Performance levels. Compliance requirements in this new standard will now address all of the components in a safety circuit while determining that circuit’s Performance Level. As such, the expected life of a component is determined and documented relative to its expected number of cycles during machine operation. Therefore, the weak links can be identified and flagged early on during the design stage. This is particularly important for those components that are electro/mechanical, such as contactors or safety relays, and have moving parts or points that wear out over time. This wearing out over time is what many people refer to as “degrading component reliability”.

   OK, great! Does anyone have an idea with this information how to reduce the surprise downtime (and possible hazard) related to this type of component failure?

4 ways to reduce surprise downtime

   Several thoughts I have are as follows:

1.)   Identify and document these components in your risk assessment for the machine.

2.)   Add these components to your preventive maintenance plan.

3.)   Plan for routine machine maintenance to replace these components before their expected failure.

4.)   Update your risk assessment for the machine.

   I have barely touched on the comprehensive approach for Functional Safety addressed by EN ISO 13849-1; 2008. Several companies and consultants offer two and three day classes on the new compliance requirements embedded in this new standard. In my opinion, to fully understand these compliance requirements you should consider contacting these sources and consider enrolling in one of their classes.

   Your comments or suggestion are always welcome so please let us know your thoughts. Submit your ideas, experiences, and challenges on this subject in the comments section below. Click on the following text if you don't see a comments box, then scroll down: Machine Safety & Degrading Component Reliability.

   Did you see the Safety Integration Webcast?

   Related articles:

EN ISO 13849-1; 2008 - Are We Ready? - Part 2

Trouble Implementing ISO 13849-1; 2006 per the European Machinery Directive

B10s at work for machine guarding

Contact: www.jbtitus.com for “Solutions for Machine Safety”.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.