Machine safety risk level assessment priority: Possibility, severity, or frequency?

Which factor has the highest priority for assessing hazard risk levels: possibility, severity, or frequency? The ANSI B11.0 – 2010 standard may help.

12/07/2012


Are the three factors of possibility, severity, and frequency of equal importance in determining the risk levels for machine safety hazards? Industry safety standards seem to treat them as equal because they don’t address any relative importance. However, what’s your experience?

Doesn’t it seem that both international and domestic standards present these three required factors for assessing risk as independent variables? Although they’re independent, they are also related because when they’re combined they help to determine risk levels of hazards and their related remediation performance requirements. This is shown in the following graph from ANSI B11.0 – 2010. In this case the qualitative process is determining the Performance Level (PL) for the given hazard. 

Using this assessment approach, if you decided that severity (of injury) required a higher priority, would the derived outcome in the risk level be any different? Similarly, would giving the possibility or frequency factors greater priority or lesser priority change the answer? In my opinion, I don’t see it!

Figure D-2: Performance Levels from ISO 13849-1:2006. Reprinted with Permission: ANSI B11.0 – 2010, B11 Standards Inc.

Yet when I talk with users about this issue, they frequently present this example. If severity of harm for a given hazard is “death,” they always give that factor a higher priority (S2) and a higher risk level, which drives the highest circuit performance for machine guarding. The highest circuit performance is PLe, which requires the average probability of dangerous failures per hour of 10-8 to 10-7. PLe means control reliable circuits with redundant components and 24/7 monitoring.

So, here’s the dilemma as I see it: If severity is S2 and frequency and possibility are F1 and P1, respectively, your derived risk level is PLc by ISO 13849-1: 2006 standard requirements. After deciding on S2 and depending on your answers for F1 or F2 and P1 or P2, you could arrive at either PLc, Pld, or PLe, per the graph above. Specifically arriving at PLe by prioritizing severity (S2) is not straightforward. If using the category system, you could likewise arrive at either Cat 1, 2, 3, or 4 by deciding on S2. Perhaps you can prioritize severity by eliminating frequency and possibility and simply defaulting to PLe or Cat 4. But, by eliminating frequency and possibility in your risk analysis, are you in compliance with the standards? Therefore, aren’t all three factors equal in priority?

Does anyone have an answer for this dilemma? Your comments or suggestions are always welcome, so please let us know your thoughts. Submit your ideas, experiences, and challenges on this subject in the comments section below (online).

- J.B. Titus, Certified Functional Safety Expert (CFSE), writes the Control Engineering Machine Safety Blog. Reach him at jb(at)jbtitus.com; www.jbtitus.com. Edited by Mark T. Hoske, content manager, CFE Media, Control Engineering and Plant Engineering, mhoske(at)cfemedia.com.

Go Online

www.controleng.com/blogs   

http://www.b11standards.com.

Contact: www.jbtitus.com for “Solutions for Machine Safety.”

See the related posts linked below.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.