Control Engineering Implementation Chronicles


Welcome to Control Engineering ’s Implementation Chronicles—your starting point for access into the heart of control and automation projects currently in progress.

Jump into the process by clicking on the link to the chronicle you would like to view.

• Project: Baton Rouge Wastewater Pump Station SCADA System
This $2 million+ project involves the design, assembly, configuration, and installation of a SCADA system to monitor and control 51 critical wastewater lift and booster stations serving the municipality's 412,000 residents, located within a 20-mile by 20-mile service area.

Project: Biopharmaceutical filtration modules
This project involves the development of an automated filtration process for a new biopharmaceutical facility. Our particular piece of the project is the automation of two process filtration modules (or skids)—one for microfiltration and one for ultrafiltration.