Thursday, June 4, 2015
Featured Item
Predictive analytics hit the midstream
Predictive analytics hit the midstream

Model-based, predictive analytics lends itself to crunching multiple data sources to pinpoint risks for pipeline integrity management, while analytics for process monitoring and measurement evolve to better discover crucial variances. Read More

More Headlines
Active cyber defense cycle: Asset identification and network security monitoring
Active cyber defense cycle: Asset identification and network security monitoring

Robert M. Lee, co-founder of Dragos Security LLC, shares his insight into the challenges of cyber security in the oil and gas industry with a five-part series on implementing the active cyber defense... Read More

Road to real-time performance improvement
Road to real-time performance improvement

Big data and industrial Internet technologies are converging to help companies monitor operations and solve problems on the fly.Read More

Sponsorship
White Paper:
Efficiency, visibility and reliability: Keys to lower costs and greater profitability in oil and gas operations.
Download here.
Real-time data integration in the digital oil field
Real-time data integration in the digital oil field

Real-time data integration is a crucial aspect of the digital oil field, but to make its integration successful, production engineers must implement a data infrastructure based on four key elements.Read More

5 tips for planning a successful automation project deployment
5 tips for planning a successful automation project deployment

Project deployment is a critical time in the life cycle of a process automation project. It follows design/development and precedes startup/commissioning. During this project stage, the process... Read More

Featured Program
Engineering Leaders Under 40
Control Engineering and Plant Engineering are now accepting nominations for the Engineering Leaders Under 40 program, which recognizes manufacturing professionals under the age of 40 who have made significant contributions to their plant’s success, and to the control engineering and/or plant engineering professions. Nominations close June 24, 2015.
Click here to nominate.
Sponsorship
Don’t Think We Can Take The Heat? Think Again!
The stable performance of the E3 Modulevel® displacer transmitter better protects downstream equipment because now it can handle up to 850°F (800°F for steam applications).
For more information go to e3modulevel.magnetrol.com.
Featured Webcast
Connecting Infrastructure
Presenter Dan McGrath from Panduit will review a maturity model and assessment approach to simplify robust industrial networking that will deliver improved overall equipment effectiveness (OEE) and path to innovation. He will also discuss tools and resources for developing a solid execution plan to transform their physical infrastructure from restrictive, poorly planned networks to more secure, effective and innovative network fabric that will deliver sustainable value.

Thursday, June 25, 2015 at 11 a.m. PT /1 p.m. CT/2 p.m. ET

Sponsored by: Panduit
Learn more.
Featured Products
Heavy duty cordset for hazardous locations
Heavy duty cordset for hazardous locations

Turck has released an expansion to its Minifast offering, which is designed for gas turbine, skid,... Read More

Supply chain and production management software portfolio
Supply chain and production management software portfolio

Honeywell Process Solutions' (HPS) Symphonite is a portfolio is designed to offer an end-to-end... Read More

Axial high voltage diodes for power supplies
Axial high voltage diodes for power supplies

Dean Technology's UFHV series of axial lead high voltage diodes are RoHS compliant and available in... Read More

Solenoid valves for chemical, pharmaceutical applications
Solenoid valves for chemical, pharmaceutical applications

Magnatrol Valve Corporation's Type A, L and Type K valves are designed for use in... Read More

Related Content
Sponsorship
NEW! Outdoor-Rated UPS … It’s What’s IN The Box That Matters!
Shouldn’t the UPS technology be as “rugged” as the enclosure in which it’s provided? Available up to 1.3 kVA single phase, the “Model LTN-3R” UPS features a NEMA 3R raintight enclosure design, output voltage regulation, and internal battery run times from 30 minutes to 9.5 hours! Rugged design … trusted performance! Why settle for less? Learn more.