12th District Police Station

New construction; 12th District Police Station; Primera Engineers Ltd.

08/15/2013


This image shows a rendering of the 12th District Police Station. Courtesy: Primera EngineersEngineering firm: Primera Engineers Ltd.
2013 MEP Giants rank:
91
Project:
12th District Police Station
Address:
Chicago, United States
Building type:
Office
Project type:
New construction
Engineering services:
Automation & Controls, Electrical/Power, Fire & Life Safety, HVAC, Lighting
Project timeline:
June 2009 to June 2012
Engineering services budget:
$400,000
MEP budget:
$1.25 million

Challenges

As part of the City of Chicago's "Neighborhood Alive" program, the Public Building Commission is building 12 new police stations across the city to replace existing facilities. These new prototype stations are 42,000 sq ft, twice that of the original stations. Primera Engineers was charged with developing an alternative to the original prototype design that included a geothermal system.

Creating an alternate prototype presented Primera with multiple engineering challenges, including the need to redesign the original prototype to include a geothermal and rainwater harvesting system without altering the overall building design or MEP spaces. In addition, the 88-well geothermal system was one of the largest urban designs put in place. Primera was able to integrate it seamlessly into the building footprint without the need to alter the usable areas, adjacencies, or program functions. Since the building is both a 24-hour facility and a cooling center, several redundancies for systems needed to be included in the design due to the critical nature of the station. This challenge complicated the design process but ultimately increased the reliability of the system.

Solutions

Primera developed an alternative to the original prototype design that included a geothermal system. The heating and cooling for the District 12 station is provided using an 88-well, closed loop geothermal field, which was placed under the adjacent 250-space parking lot. Primera also provided a modular water-to-water heat pump system that could heat and cool simultaneously and ultimately provide excellent redundancy for the facility. This modular system also allowed for the new systems to fit without altering the station design. Lastly, Primera was able to modify the building's central plant while utilizing the same airside system design. The modified design reduced the learning curve for maintenance personnel and end users due to their familiarity with the original system and a need to only learn how to work with the revised plant.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.