5 ways to avoid scope creep on an engineering project

Automation System Integration Blog tells how to avoid scope creep. See these points of advice and diagram from Anthony Baker to keep your next machine design, panel build, software design, or other engineering project on track. Add your advice below.

09/11/2013


In green is the original scope for the engineering or system integration project, what was in the SOW (scope of work), and everyone agreed do. As you’re working through the project, “VOILA!”—new and amazing scope items come to light. A lot of budget is stIf you work in an engineering project-based world, I am sure you have heard the term “scope creep.” Specifically, it’s when additional scope items are added to a project along the way. These might be amazing things, valuable additions that are core to the success of the project, but they are still scope creep and should be handled very, very carefully.

Chart the scope

Having said that, one of the best ways I’ve found to describe the dangers of scope creep is pictorially. Pretend the squares in the image represent a bar chart.

In green is the original scope for the engineering or system integration project, what was in the SOW (scope of work), and everyone agreed do. As you’re working through the project, “VOILA!”—new and amazing scope items come to light. A lot of budget is still available, and these additional tasks seem easy, so you do them—there’s the yellow.

Bad day in project management

Then the bad day comes. You get toward the end of the project, the budget is 90% used, and the client (internal or external) pulls out the SOW document and says something like, “Hey, do you remember line item 126b, where it said you would supply XYZ components? Well I still want that.”

BUSTED. Now you can’t do anything, the green changes to red, and the clear project control you thought you have had all along goes out the window.

Avoid project scope creep

Avoiding project creep is straightforward, if not always easy.

1. Know your scope. If you haven’t read the quote or SOW 10 times, you don’t know your scope.

2. Know your dollars, in real-time, all the time.

3. Get the client used to change orders, but do it gently. When yellow comes along, write it up. Even if you give it away, ensure you are keeping a log along the way. You cannot do this retroactively. It NEVER works when you come to the end of the project, have more project than budget and/or time, then say to the client, “Remember all those nice things we did before?” This NEVER works. EVER.

4. Talk dollars all the time. It can be uncomfortable, but you have to build a relationship that can be friendly and talk about money too. (See a neat book by Dan Arielly about Market Norms Vs. Social Norms for reference.

5. Live to the scope of work (SOW). First get this done, 100%, and then talk about what you can do afterward.

For good project managers (PMs) out there, I’m sure there is a bigger list, but I’ve found if you follow these top five ways to avoid scope creep, you will have a good start.

Engineering interaction: Have additional advice? Use the comment box at the bottom to add to the list based on your experiences.

- The Automation System Integration Blog aggregates expert advice from Callisto Integration, providing manufacturing consulting and systems integration. This blog provides integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. Andrew Barker, P.Eng., Callisto Integration, compiled the advice. www.callistointegration.com

See other Automation System Integration Blog postings linked below.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.