AIA announces first-year energy data

Firms in the 2030 Commitment Program have reported a combined average 35.1% PEUI reduction.

05/12/2011


The AIA has announced the first-year results of projected energy use data from firms participating in its 2030 Commitment Program. The firms reported a combined average 35.1% predicted energy use intensity (PEUI) reduction, and the largest PEUI reduction reported by a firm is 70.6%.

The 2030 Commitment Program was created in 2009 by AIA; it is a voluntary initiative for AIA member firms and other entities in the built environment to make a pledge, develop multi-year action plans, and implement steps that can advance AIA’s goal of carbon-neutral buildings by the year 2030.  At the end of the 2010 calendar year, firms were asked to submit an assessment of their 2010 design work using a tool released by the AIA last year. 

“The findings are a good first step to see where we are as an industry in reaching the ultimate goal of achieving carbon neutrality in buildings by 2030.  It is encouraging to see the number of participating firms in this program and the large amount of real estate that their projects account for,” said AIA EVP and CEO, Robert Ivy.  “That said, it is also a wake-up call for the profession that we need to be more steadfast in the prediction of energy usage in design projects, as well as collecting actual post-occupancy performance data.”

A new reportMeasuring Industry Progress towards AIA 2030 Carbon Reduction Goal, includes data from 56 firms accounting for nearly 385 million gross sq ft (GSF) nationwide.  The key findings include:

  • Firms reported a combined average 35.1% predicted energy use intensity (PEUI) reduction from the national average EUI.
  • The largest PEUI reduction reported by a firm is 70.6%.
  • The smallest PEUI reduction reported by a firm is 11.6%.
  • The combined firms design portfolio that is meeting the current goal of a 60% reduction in carbon emissions reduction from the national average is 12.1%.
  • The largest percentage of GSF of active projects meeting goal reported by one firm is 69.8%.
  • The smallest percentage of GSF of active projects meeting goal reported by one firm is 0% (reported by multiple firms).
  • GSF of projects currently being energy modeled is 58%.
  • The percentage of projects that will collect actual data is 38%.

The full report also contains participating firm demographics, energy reduction initiatives undertaken by firms and anecdotal accounts of the challenges and lessons learned through participating in the 2030 Commitment Program.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Big plans for small nuclear reactors: Simpler, safer control designs; Smarter manufacturing; Industrial cloud; Mobile HMI; Controls convergence
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.