Application: Water utility brings calibration in house

Calibration--Do it yourself or farm it out?

02/21/2008


The water department had two choices: Either keep paying a service contractor to calibrate flowmeters, or buy the same tool he used to do the job themselves. Their choice paid off.

After replacing aging turbine flowmeters with ABB magnetic flowmeters , the City of Mesa, AZ, water division had 36 new 12 inch devices to add to the calibration schedule. They had been calling an ABB service technician to calibrate other magnetic flowmeters, so the choice was either to expand the service contract or buy the necessary calibration tools and do all the magnetic units themselves.

Since those flowmeters are responsible for watching over 30 billion gallons of treated water annually, accuracy is critical and needs to stay around

The maintenance team purchased a CalMaster calibration verification tool. It is a portable, PC-based system designed for use with MagMaster brand magnetic flowmeters offered by ABB Instrumentation. The purchase included factory training of a division staff member so they gained in-house capability to verify and re-certify the calibrated accuracies not only of the new well meters but also of existing MagMaster flowmeters distributed throughout the system.

Each MagMaster primary sensor and its transmitter are factory-calibrated as a matched pair. The two are shipped with a memory card that contains a "fingerprint" with all pertinent calibration data for this specific sensor, including the shielded cable that carries the small millivolt measuring signal from the sensor to its transmitter.

The primary sensor stays in operation on the water line and connects by shielded cable to its stand-mounted flow transmitter. The continuous flow measurement is never interrupted. The PC contains software to carry out a 10- to 14-minute, preprogrammed verification procedure based on the data contained on the memory card. When the operator initiates the test, the PC carries out a check of the entire system: meter primary sensor, transmitter, and connecting cable.

To confirm that the test results are within set standards, the test operator reviews them on the display. If the results are positive, a certificate of validation for the tested metering system can be printed out and filed in the maintenance records.

The CalMaster also provides valuable diagnostic tools for preventive maintenance. It stores a history of calibration data from successive tests, so that trend curves for selected system components can be plotted on the PC. Thus, a gradual degradation in a component, such as a magmeter coil, can be detected and the component scheduled for repair or replacement.

Follow the real-world problems and solutions of the Baton Rouge wastewater system through the System Integration Water/Wastewater blog.

—Edited by Peter Welander, process industries editor, PWelander@cfemedia.com ,
Process Instrumentation & Sensors Monthly
Register here and scroll down to select your choice of free eNewsletters .





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Intelligent, efficient PLC programming: Cost-saving programming languages are available now; Automation system upgrades; Help from the cloud; Improving flow control; System integration tips
Smarter machines require smarter systems; Fixing PID, part 3; Process safety; Hardware and software integration; Legalities: Integrated lean project delivery
Choosing controllers: PLCs, PACs, IPCs, DCS? What's best for your application?; Wireless trends; Design, integration; Manufacturing Day; Product Exclusive
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.
This article collection contains several articles on improving the use of PID.
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again