SEARCH Archives
Loading
Sponsored by:

Architecture Billings Index holds steady for Q1

The ABI remained virtually unchanged and close to the break-even level for the first quarter of 2011.

Source: AIA

04/20/2011


The first quarter of 2011 has seen the Architecture Billings Index (ABI) remain virtually unchanged and right at, or slightly above, the break-even level.  As a leading economic indicator of construction activity, the ABI reflects the approximate nine- to 12-month lag time between architecture billings and construction spending.  The American Institute of Architects (AIA) reported the March ABI score was 50.5, a negligible decrease from a reading of 50.6 the previous month.  This score reflects a modest increase in demand for design services (any score above 50 indicates an increase in billings). The new projects inquiry index was 58.7, up significantly from a mark of 56.4 in February.

“Currently, architecture firms are essentially caught swimming upstream in a situation where demand is not falling back into the negative territory, but also not exhibiting the same pace of increases seen at the end of 2010,” AIA Chief Economist Kermit Baker said. “The range of conditions reported continues to span a very wide spectrum with some firms reporting an improving business environment and even ramping up staffing, while others continue to operate in survival mode. The catalyst for a more robust recovery is likely financing, with stronger growth occurring only when lending institutions begin approving credit for construction projects with much greater regularity.”

Key March ABI highlights:

  • Regional averages:  Midwest (53.5), Northeast (51.4), West (50.6), South (49.7)
  • Sector index breakdown: commercial/industrial (54.7), multi-family residential (50.8), mixed practice (49.8), institutional (48.0)
  • Project inquiries index: 58.7


No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Nominate today - Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Device diagnostics drive improved plant performance, Machine vision, Stepper motor systems
Robotic innovations, safety, Industrial energy management, Lambda tuning for PID, HMIs: All about software
CNC Way beyond traditional; Remote I/O, new approaches; Inside Process: APC, PID, cyber-security
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.


Poll of the Week

How integrated are your maintenance, controls, and instrumentation systems?
Fully integrated
Somewhat integrated
Loosely integrated
They're not


Click Here for Poll Archives
Sponsored by:

CFEMedia.com | Subscribe to Magazine | Advertise | Contact Us | About Us | Site Map | Privacy Policy
Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.