BRAC 133—Washington Headquarters Services

New construction: BRAC 133—Washington Headquarters Services; Southland Industries

08/09/2012


The BRAC 133 project including the towers and parking structures is shown.Project name: BRAC 133—Washington Headquarters Services

Location: Alexandria, Va.

Firm name: Southland Industries

Project type, building type: New construction, office

Project duration: 3 years

Project completion date: Aug. 9, 2011

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $125 million

Engineering challenges

Southland Industries was the engineer of record and installing contractor for five trades: sheet metal, piping, plumbing, fire protection, and controls. As part of the BRAC program, the project was required to adhere to a strict, accelerated schedule set forth by BRAC guidelines. In addition, the project started approximately a year later than originally planed. Ultimately, the project was delivered 5 weeks ahead of schedule. Another challenge for the BRAC 133 design team was that the building request for proposal (RFP) indicated that ASHRAE 90.1, U.S. Green Building Council LEED Silver, and the Energy Policy Act of 2005 were part of the contract requirements. During design, the project team was able to exceed the minimum energy goals, which enabled the building to be awarded with LEED Gold certification. The magnitude, schedule, complexity, and scope of the project combined to create a challenging engineering project.

Solutions

This indoor DOAS unit serves the BRAC 133 East Tower.The BRAC 133 project in Alexandria, Va., is a 1.7 million-sq-ft office tower owned by the Department of Defense. Southland utilized its engineering ability to develop a system that consumed approximately 27.5% less energy than a similar building utilizing an ASHRAE 90.1 baseline model. The building utilizes an innovative fan-powered induction terminal unit (FPIU) system with outside air (OSA) provided by a dedicated outdoor air system (DOAS). The fan-powered induction unit is a modified series fan-powered variable air volume terminal unit equipped with a filter, primary (outside) air valve, supply air fan and electrically commutated motor (ECM), heating coil, and sensible only cooling coil. Dehumidified OSA is supplied to the zone for humidity and CO2 concentration control. Induced air is filtered and then cooled or heated through the use of a sensible only cooling coil, or heating hot water heating coil. Induced air is supplied to the space along with outdoor air to maintain the zone temperature, humidity, and CO2 level setpoints. The building is supplied with two chilled water-cooling loops. A 42 F (5.6 C) latent chilled water loop is utilized for dehumidification of outdoor air and cooling in zones where a high latent load is present. A 55 F (12.8 C) sensible chilled water loop is utilized to provide sensible only cooling to the fan-powered induction units and information technology (IT) loads. The use of the warmer, sensible chilled water loop yields significant increase in waterside economizer usage along with increased chiller efficiency. The net result is a high-efficiency cooling system that provides optimal occupant thermal comfort. Without Southland’s engineering and energy modeling capabilities, the BRAC 133 project would not have met its project goals.

Additional Information

View a presentation from Southland Industries on the project



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.