Cleveland Clinic Pathology, Laboratory Medicine Institute

New construction: Cleveland Clinic Pathology and Laboratory Medicine Institute; Karpinski Engineering

08/09/2012


Laboratory gas systems (Click to enlarge)Project name: Cleveland Clinic Pathology and Laboratory Medicine Institute

Location: Cleveland, Ohio

Firm name: Karpinski Engineering

Project type, building type: New construction, research/lab/high-tech

Project duration: 1.2 years

Project completion date: Jan. 20, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $35 million

Engineering challenges

The challenges associated with the project complexity and time schedule were met by utilizing BIM. The contractors were provided with a complete 3-D model of the building including all MEP Air handling unit (100% outside air) (Click to enlarge)architectural and structural systems. Through biweekly BIM team coordination meetings with the contractors, architects, engineers, and construction managers, conflicts were identified and resolved immediately. The team approach that was deployed during the coordination meetings allowed equipment and systems to be installed with minimal changes in the field. The construction management team stated that without the BIM coordination process, the project would have not been built on time and within budget. A 40% energy savings over ASHRAE 90.1 was critical to obtaining the LEED Gold certification. Energy-saving measures included heat recovery coils, VAV lab hoods, ultrasonic humidification, and LED lighting.

Solutions

To deal with these design constraints, the HVAC design utilized a central water system supplying local water-cooled HVAC units, with air cool units serving the public and food courts. Pump staging and VFDs were used to vary water supply to meet the partial load conditions and provide a more energy-efficient system. In order to deal with the backup power requirements and limited space, the generators were located in the underground areas with exhaust and cooling water systems skillfully routed to the roof level and hidden from view. The supply air is routed underground utilizing a ductwork system powered by a set of in-line fans, and the exhaust air is removed via strategically located air shafts hidden from view and powered by dedicated up-blast fans.

Additional Information 

View a presentation from Karpinski Engineering on the project

Emergency power generator (Click to enlarge)Heat recovery piping mains (Click to enlarge)



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.