Cleveland Clinic Pathology, Laboratory Medicine Institute

New construction: Cleveland Clinic Pathology and Laboratory Medicine Institute; Karpinski Engineering

08/09/2012


Laboratory gas systems (Click to enlarge)Project name: Cleveland Clinic Pathology and Laboratory Medicine Institute

Location: Cleveland, Ohio

Firm name: Karpinski Engineering

Project type, building type: New construction, research/lab/high-tech

Project duration: 1.2 years

Project completion date: Jan. 20, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $35 million

Engineering challenges

The challenges associated with the project complexity and time schedule were met by utilizing BIM. The contractors were provided with a complete 3-D model of the building including all MEP Air handling unit (100% outside air) (Click to enlarge)architectural and structural systems. Through biweekly BIM team coordination meetings with the contractors, architects, engineers, and construction managers, conflicts were identified and resolved immediately. The team approach that was deployed during the coordination meetings allowed equipment and systems to be installed with minimal changes in the field. The construction management team stated that without the BIM coordination process, the project would have not been built on time and within budget. A 40% energy savings over ASHRAE 90.1 was critical to obtaining the LEED Gold certification. Energy-saving measures included heat recovery coils, VAV lab hoods, ultrasonic humidification, and LED lighting.

Solutions

To deal with these design constraints, the HVAC design utilized a central water system supplying local water-cooled HVAC units, with air cool units serving the public and food courts. Pump staging and VFDs were used to vary water supply to meet the partial load conditions and provide a more energy-efficient system. In order to deal with the backup power requirements and limited space, the generators were located in the underground areas with exhaust and cooling water systems skillfully routed to the roof level and hidden from view. The supply air is routed underground utilizing a ductwork system powered by a set of in-line fans, and the exhaust air is removed via strategically located air shafts hidden from view and powered by dedicated up-blast fans.

Additional Information 

View a presentation from Karpinski Engineering on the project

Emergency power generator (Click to enlarge)Heat recovery piping mains (Click to enlarge)



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Additive manufacturing advancements; Machine vision enhances robotics; Fieldbus evolution; Process safety; Advice from System Integrators of the Year; Road to IANA
Salary and career survey: Benchmarks and advice; Designing controls; Remote data collection, historians; Control valve advances; Hannover Messe; Control Engineering International
System integration: Best practices and technologies to help; Virtualization virtues; Cyber security advice; Motor system efficiency, savings; Product exclusives; Road to Hannover
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
click me