Code requirements for arc flash reduction

NEC 240.87 is an important leap in arc flash safety for the electrical industry. This is a recap of an Eaton-sponsored webcast on April 24, which highlighted the 2014 standard.

04/24/2014


Arc flash incidents occur all too often and can impact many lives. To address this problem in the industry, electrical engineers turn to codes and standards. In a 10-year study of 120,000 workers, there were 125 injuries, as a result of arc flash, per year. Seventy-seven percent of these injuries were due to electrical arc, and 21% of these injuries resulted in permanent disabilities, according to speaker Jim Dollard, safety coordinator, IBEW Local 98. These statistics, Dollard said, demonstrate the importance of preventing and protecting one's employees from arc flash.

During the April 24 presentation, Dollard, who originally proposed NEC Section 240.7, shared his vision of workplace safety and the National Electric Code (NEC). He explained how Section 240.87 is paramount to those who work in and around electrical equipment. β€œIn 2014 we have tremendous clarity,” he said in regards to the now more protective and proactive code standards.

The new code requirements for NEC 2014 Section 240.87 state: 

  • Documentation. Documentation shall be available to those authorized to design install, operate, or inspect the installation as to the location of the circuit breaker(s).
  • Method to Reduce Clearing Time. One of the following or approved equivalent means shall be provided:
    1. Zone-selective interlocking
    2. Differential relaying or
    3. Energy-reducing maintenance switching with local status indicator or
    4. Energy-reducing active arc flash mitigation system or
    5. An approved equivalent means.

In addition to Dollard, speaker Thomas Domitrovich, PE, LEED AP, Eaton, presented various arc reduction technologies and their appropriate application selection criteria. Speaker Ken White, a retired electrical engineer, Olin Chlor-Alaki, recounted a personal experience with a near arc flash disaster and how technology played an important role in maintaining safety in his facility.

View the full, on-demand hour-long Webcast and extended Q&A in early May. You can also join the discussion about this webcast on Twitter at #CSEarcreduction.

The Webcast speakers were Thomas Domitrovich, PE, LEED AP, Eaton, Pittsburgh; Ken White, retired, Olin Chlor-Alaki, Niagara Falls, N.Y.; and Jim Dollard, safety coordinator, IBEW Local 98, Philadelphia. The Webcast moderator was Jack Smith, content specialist, CFE Media.

- Edited by Jessica DuBois-Maahs, associate content manager, CFE Media.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.