Complete connectivity: Vendors offer more options for linking plant- and enterprise-level systems

Manufacturing execs seeking to view real-time production data through an ERP system interface now have two new options—one from SaaS-enabled ERP vendor Plex Systems, and one from communications software specialist Kepware—for making that connection.

03/03/2009


Manufacturing executives seeking to view real-time production data through an ERP system interface now have two new options for making that connection.
Plex Systems , which offers the Plex Online ERP suite in the Software-as-a-Service (SaaS) model, recently added an integrated set of manufacturing execution system (MES) modules to its lineup. And Kepware , a supplier of software for connecting plant-floor devices to enterprise systems, has released new solutions for passing data to the Oracle E-Business Suite .
The new Plex Online modules make it easier for users of traditional ERP-level applications such as order entry, CRM, or accounting & finance to incorporate production status information into their business decision-making.
“Today’s manufacturer is under tremendous pressure to develop high-quality products quickly and cost-effectively,” says Plex Systems CEO and President Mark Symonds. “OEMs are paring their supplier lists and frankly, it is a tough time to be in business. Plex Online gives manufacturers an edge in that they are better able to measure and manage quality, shop-floor and machine operations, production and more, while streamlining the entire supply chain.”


Plex Systems CEO and President Mark Symonds says pressure to develop high-quality products quickly and cost-effectively is driving manufacturers’ desire to link plant and enterprise-level systems.

With the new MES functionality, the Plex Online suite now consists of more than 350 modules to manage operations from the shop floor to the top floor, including:
• Quality management and machine integration;
• Accounting & finance;
• Order entry and tracking; and
• Supplier quality and traceability.
According to Symonds, Plex Online can capture data at the point of origin and process it real-time. Production, machine integration, customer requirements, and other data flow seamlessly into production operations and financial reports, he says, giving the entire supply chain ready access to real-time data about production. The end result is better management of the complexities relative to launching new products, improving supply chain collaboration, and lower overall operating costs.
The new Kepware offering—KEPServerEX—incorporates more than 130 communications protocols supporting connectivity to thousands of plant-floor devices. The latest version of the solution is built to deliver plant-level data directly to Oracle’s Manufacturing Operations Center—which is Oracle’s version of MES—and the discrete manufacturing components of the Oracle E-Business Suite.
Kepware began creating these connectivity solutions shortly after announcing a formal development relationship with Oracle in early 2008.
“Through our work with Kepware, we are enabling our joint customers to connect Oracle Applications to virtually every piece of equipment on the plant floor,” explains Jon Chorley, Oracle VP of SCM product strategy. “This enables increased visibility, productivity, and manufacturing efficiencies, all of which are critical components to staying ahead of the competition.”





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.