Cordsets for Foundation fieldbus

These Type A cordsets are the first of their kind to meet Fieldbus Foundation specifications.

11/25/2008


Fieldbus cordsets

MINI SAC7/8-inch cordsets are the first cables with attached connectors to receive official compliance registration in accordance with the Fieldbus Foundation's FF-844 requirements for H1 Type A cable. The H1 Cable Test Specification (Document FF-844) is designed for manufacturers developing cables for FOUNDATION Fieldbus H1 (31.25 kbit/s) installations. The specification test cases, based upon the IEC 61158-2:2003 standard, include (but are not limited to) impedance, capacitive unbalance, connector pin-outs and attenuation.

The Type A overmolded cordset for H1 physical media is constructed of instrumentation tray cable (ITC)/power-limited tray cable (PLTC-ER). Under the National Electric Code (NEC), this cable can be used as open wiring without a metallic sheath or armor between the cable tray and equipment for up to 15 meters. Because it is not necessary to install conduit to every individual device, ITC reduces the installation time and cost.

Phoenix Contact
www.phoenixcontact.com





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Intelligent, efficient PLC programming: Cost-saving programming languages are available now; Automation system upgrades; Help from the cloud; Improving flow control; System integration tips
Smarter machines require smarter systems; Fixing PID, part 3; Process safety; Hardware and software integration; Legalities: Integrated lean project delivery
Choosing controllers: PLCs, PACs, IPCs, DCS? What's best for your application?; Wireless trends; Design, integration; Manufacturing Day; Product Exclusive
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.
This article collection contains several articles on improving the use of PID.
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again