Create value with re-use

When you finish a project, begin working to catalog what was built, the standards used (and improved), and where and how that work could be applied in future. Not-invented-here syndrome is a common challenge in system integration and with engineering in general. See chart and table.

06/10/2013


How much re-use are you getting out of your projects? In other words, when you finish one project what parts can you directly apply to the next? As a specific example we often ask the question:

How many projects can a great Functional Design Specification (FDS) affect before the start of a project:

- One

How many projects can a great FDS effect after the project if time is taken to complete the as-built document, add screen-shots with callouts, and file with an appropriate version number in a public space for sharing?

- 10? 20? Many.

Why then do so many projects drop the ball after the project is complete and walk away without working to catalog what was built, the standards used (and improved) and where and how that work could be applied in future. Not-invented-here syndrome is a common challenge in system integration (and engineering in general) but if we can get move past this the potential for both individual project success as well as long term growth of the integration industry is huge. As a summary, the chart details the integration project costs (both as dollar and percentage values) for a two-plant install between continents.  The Plant 1 design and implementation contributed directly to Plant 2. All efforts listed represent direct integration costs only.

Software reuse drastically reduces system integration costs as this chart shows. Courtesy: Callisto Integration.

 

 

Software reuse drastically reduces system integration costs, as this table shows. Courtesy: Callisto IntegrationFurther to the direct integration benefits of re-use, client-centric benefits include:

 

Lower project risk – Components identified as new/different are noted as risk factors and engineering effort is spent up front mitigating that risk. As an example, a set of pre-built VM servers that can be re-used from project to project will lower the risk of incorrect software install order, unsupported patch installations, or other configuration errors, which can result in longer setup and commissioning time. 

 

·         Lower support cost – If the same standards are used across multiple sites or lines, the net training effort required for the organization drops significantly. As an example, a video-recorded training presentation which outlines application navigation and troubleshooting can be created and viewed in multiple plants and multiple languages with only one investment in content development.

 

·         Lower threshold for improvement – as an improvement is identified it can be quickly copied from one plant to another. As an example, a recipe improvement in one plant could be electronically submitted to another for next-day business return on investment (ROI).

 

·         Lower per-project design cost – Re-using software from one project to another has a direct, positive impact on business project management costs such as the total time required by H.B. Fuller employees in software reviews (43 vs. 2 as outlined in previous graph)

 

In summary: change your focus. What you do after commissioning should be held in as high regard as what you do before.

- Anthony Baker strikes again: Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration. This blog provides integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. Andrew Barker, P.Eng., Callisto Integration, compiled the advice. www.callistointegration.com

Callisto Integration is a CSIA member as of 3/1/2015



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
System integration: Best practices and technologies to help; Virtualization virtues; Cyber security advice; Motor system efficiency, savings; Product exclusives; Road to Hannover
Collaborative robotics: How to improve safety, return on investment; Industrial Internet of Things, Industrie 4.0: World views; High-performance HMI, Information Integration: OPC and OMG
9 tips: How to integrate a servo system; Process control mathematical models; Serial network grounding; Engineers' Choice Awards; Learn from cyber security mistakes
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
click me