Desalination plant in Saudi Arabia to receive control system

The SWRO-4 Desalination Plant in Jubail, Saudi Arabia, will be using a control system provided by Yokogawa for monitoring and online diagnosis of the instrumentation devices in the plant.

12/31/2013


The SWRO-4 Desalination Plant in Jubail, Saudi Arabia, will be using a control system provided by Yokogawa for monitoring and online diagnosis of the instrumentation devices in the plant. Courtesy: YokogawaYokogawa's subsidiary, Yokogawa Middle East & Africa, has received an order from Petroleum, Chemicals & Mining Company Limited (PCMC) to supply the control system for the SWRO-4 Desalination Plant, which is being built in Jubail, Saudi Arabia by the Power & Water Utility Company for Jubail and Yanbu (Marafiq).  

Jubail, located in the northern part of the Arabian Gulf, is one of the two major industrial cities in Saudi Arabia (the other is Yanbu on the Red Sea), and Marafiq provides electricity and water to both cities. The plant under construction, SWRO-4, will use reverse osmosis (RO) membranes to desalinate seawater, and will be able to produce 100,000 cubic meters of potable water per day. This is greater than the combined output of 77,000 cubic meters per day from the five desalination plants that Marafiq currently owns and operates in Jubail. The desalinated water from the new plant will be provided to the Jubail area. 

Yokogawa will deliver the Centum VP integrated production control system and the Plant Resource Manager (PRM) integrated device management package, the latter of which will be used for the monitoring and online diagnosis of the instrumentation devices in this plant. In addition, Yokogawa will deliver an operator training system to improve operator performance. Delivery is scheduled for 2014 and the plant will start operation at the end of September 2014.

Yokogawa

www.yokogawa.com 

- Edited by CFE Media. See more Control Engineering control system and process manufacturing stories.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.