SEARCH Archives
Loading
Sponsored by:

Digital automation system selected for pharmaceutical production facility

Hanwha Chemical selected Emerson's DeltaV digital automation system for their pharmaceutical production facility in South Korea.

09/23/2011


Emerson Process Management is installing its DeltaV system for Hanwha Chemical's pharmaceutical production facility in South Korea. Courtesy: EmersonHanwha Chemical has selected Emerson Process Management to supply and commission its DeltaV digital automation system for a pharmaceutical production facility in Osong Bio-technology Technopolis, Chungcheongbuk-do, Korea. Known as the Eagle Project, the facility will manufacture Hanwha’s biosimilar rheumatoid arthritis drug HD203. The DeltaV system will play a key role in automating the facility’s biotechnology process and support the compliance requirements for FDA approval. Project completion is planned for 2012.

The 2,900-I/O Eagle Project will consolidate its plant process using an integrated system of Emerson’s DeltaV S-Series, AMS Suite asset management software, and audit/change control functionality that supports validation requirements.

Emerson will provide a total of 34 Electronic Marshalling panels, 10 operator workstations installed in the clean room process areas, five manager workstations, and five server stations. The server stations will be used for the process historical data collection, alarm management, complete batch control, and diagnosis of the engineering and control systems.

Process package equipment will be integrated via Profibus DP/MODBUS/OPC communication and the status of all the I/O and devices will be monitored to assess their operating condition.

Emerson’s Electronic Marshalling will not only reduce the site construction time and cost, but also provide a complete solution for future I/O expansion and plant management, because it can be installed in the proximity of devices in the process area and provide the ultimate in flexibility – allowing users to choose I/O type on a channel by channel basis.

Emerson’s AMS Suite asset management software will be used during installation of measurement and control devices to help reduce costs and improve device startup efficiency.

www.emersonprocess.com 

Emerson Process Management

www.emerson.com 

Emerson

- Edited by Chris Vavra, Control Engineering, www.controleng.com 



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Nominate today - Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Robotic innovations, safety, Industrial energy management, Lambda tuning for PID, HMIs: All about software
CNC Way beyond traditional; Remote I/O, new approaches; Inside Process: APC, PID, cyber-security
Servodrive Control: Precise Power, PLCs vs. PACs, Virtualization, Best Products: Engineers' Choice Awards
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control...
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.


Poll of the Week

How integrated are your maintenance, controls, and instrumentation systems?
Fully integrated
Somewhat integrated
Loosely integrated
They're not


Click Here for Poll Archives
Sponsored by:

CFEMedia.com | Subscribe to Magazine | Advertise | Contact Us | About Us | Site Map | Privacy Policy
Channels | New Products | Media Library | Connect | Industry News | Events and Awards | Newsletters | Blogs | Magazine
Control Engineering | Plant Engineering | Consulting-Specifying Engineer
All content copyright © 2010-2013 CFE Media. All rights reserved.