DOE guarantees $1.187 billion loan for California solar project

The DOE offered a conditional commitment for a loan guarantee to support the California Valley Solar Ranch project, which will produce enough power for almost 60,000 homes.


U.S. Energy Secretary Steven Chu announced the offer of a conditional commitment for a $1.187 billion loan guarantee to support the California Valley Solar Ranch project, sponsored by SunPower Corp. The project, which is being built in San Luis Obispo County, Calif., includes the construction of a 250 MW ac photovoltaic (PV) solar generating facility and associated infrastructure. California Valley Solar Ranch is expected to create 350 jobs during construction and 10 to 15 permanent jobs. The project is also expected to avoid over 430,000 tons of carbon dioxide annually and produce enough to power for nearly 60,000 homes.

"The efficiencies created by the California Valley Solar Ranch project will help lower the cost of solar power and encourage more utility-scale solar deployment," Chu said.


California Valley Solar Ranch will be the largest utility-scale PV project in the U.S. to use tracking technology and an innovative monitoring system that will improve annual output by approximately 25% compared with traditional fixed PV installations. The project will utilize single-axis trackers controlled by a wireless tracker monitoring and control (TMAC) system to orient the PV modules toward the sun and maximize solar collection.  The TMAC monitoring system receives real-time weather updates so the solar array can be stowed in harsh weather conditions to preserve the life of the solar modules. Pacific Gas and Electric Company, the largest utility in California, will purchase all the output from the project. 


The U.S. Dept. of Energy (DOE), through the Loan Programs Office, has issued loan guarantees or offered conditional commitments for loan guarantees totaling over $19 billion to support 21 clean energy projects. The program's 10 generation projects will produce over 23 million MWh, enough to power over two million homes. 

No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Machine design tips: Pneumatic or electric; Software upgrades; Ethernet advantages; Additive manufacturing; Engineering Leaders; Product exclusives: PLC, HMI, IO
Industrial wireless cyber security: More complex than black and white; IIoT at the I/O level; Process modeling; Cyber security research
Robotic advances: Software, form factors; System-based ROI; Embedded control; MES and information integration; SCADA and cyber security; Position sensor; Controller, I/O module
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Cyber security attack: The threat is real; Hacking O&G control systems: Understanding the cyber risk; The active cyber defense cycle