EN ISO 13849-1, the quantitative approach to machine safety begins with a qualitative process

EN ISO 13849-1 has now been fully in force since Jan. 1, 2012, without exception and EN 954 has fully been withdrawn. We’ve heard for four years or more that this change in direction equates to a paradigm shift for industry because it in part moves hazard level determination and mitigation from a qualitative process to a quantitative process. There’s more...

01/06/2012


JB Titus, CFSEEN ISO 13849-1 has now been fully in force since Jan. 1, 2012, without exception and EN 954 has fully been withdrawn. We’ve heard for four years or more that this change in direction equates to a paradigm shift for industry because it in part moves hazard level determination and mitigation from a qualitative process to a quantitative process. There’s more to this story!

   It’s true that the Performance Level (PL) system of EN ISO 13849-1 is quantitative based at the completion of the process. I’ve read that the “fathers” of this standard determined that a quantitative approach was needed to both have a direct comparison to the Safety Integrity Level (SIL) system for hazards and to provide the basis for the validation requirements of EN ISO 13849-2. With this system engineers can now calculate the performance level of the safety related parts of the control system (SRP/CS) for each selected safety function. However, this entire process begins (in part) by determining a required performance level (PLr) for each safety function using a qualitative process. In fact, let’s look at the actual 4.3 clause of EN ISO 13849-1 below:

4.3 Determination of required performance level (PLr) - performance level (PLr) for each safety function using a qualitative process, as noted in the 4.3 clause of EN ISO 13849-1.

4.3 Determination of required performance level (PLr)

 

   For each selected safety function to be carried out by a SRP/CS, a required performance level (PLr) shall be determined and documented (see Annex A for guidance on determining PLr). The determination of the required performance level is the result of the risk assessment and refers to the amount of the risk reduction to be carried out by the safety-related parts of the control system (see Figure 2). 

   The greater the amount of risk reduction required to be provided by the SRP/CS, the higher the PLr shall be.

    In Annex A you will find two pages that guides you through the qualitative process of asking three questions; severity of injury, frequency of exposure, and possibility of avoidance. Doesn’t this sound eerily like the three qualitative questions used to determine the hazard Categories of B, 1, 2, 3, and 4? The risk graph below looks very similar to the Category graph with the exception of Performance Levels a, b, c, d, and e. The standard goes on to say that the Performance Level (PL) (calculated) must be equal or greater than the PLr.

   So, for everyone who has already made the transition to EN ISO 13849-1 – please let us know your thoughts on how much the “fathers” have gained whereas it seems the basis can be argued we are still in a qualitative world of hazards! 

   Your comments or suggestion are always welcome so please let us know your thoughts. Submit your ideas, experiences, and challenges on this subject in the comments section below. Click on the following text if you don't see a comments box, then scroll down: EN ISO 13849-1, the quantitative approach to machine safety begins with a qualitative process! 

    Related articles:

How To Integrate Safety

Machinery Directive In 4 Days Drops EN 954 and EN ISO 13849-1 Is Fully In Force – What’s Your Impact?

Updating Minds About Machine Guarding

Contact: www.jbtitus.com for “Solutions for Machine Safety”.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.