Engineering in K-12 schools: Electrical, power systems

Engineers offer practical advice and best practices on how to design electrical, power, and renewable energy systems in K-12 schools.

03/17/2014


 Keith R. Hammelman, PE, Vice president, CannonDesign, Aurora, Ill.Robert V. Hedman, PE, LEED AP BD+C, Senior associate, Kohler Ronan LLC, Danbury, Conn.Pete Jefferson, PE, LEED AP, HBDP, Principal/vice president, M.E. Group, Overland Park, Kan.Essi Najafi, Principal, Global Engineering Solutions, Rockville, Md.Rodney V. Oathout, PE, CEM, LEED AP, Regional engineering leader/principal, DLR Group, Overland Park, Kan.Sunondo Roy, PE, LEED AP BD+C, Vice president, CCJM Engineers, Chicago, Il.

  • Keith R. Hammelman, PE, Vice president, CannonDesign, Aurora, Ill.
  • Robert V. Hedman, PE, LEED AP BD+C, Senior associate, Kohler Ronan LLC, Danbury, Conn.
  • Pete Jefferson, PE, LEED AP, HBDP, Principal/vice president, M.E. Group, Overland Park, Kan.
  • Essi Najafi, Principal, Global Engineering Solutions, Rockville, Md.
  • Rodney V. Oathout, PE, CEM, LEED AP, Regional engineering leader/principal, DLR Group, Overland Park, Kan.
  • Sunondo Roy, PE, LEED AP BD+C, Vice president, CCJM Engineers, Chicago, Il.

At this alternative high school in Colorado, renovations included creating open and well day-lit classrooms, breakout spaces, and outdoor spaces. The project is pursuing LEED Gold. Courtesy: M.E. Group

CSE: Describe some recent electrical/power system challenges you encountered when designing a new building or retro-commissioning an existing building.

 

Hedman: Many of our K-12 new buildings are additions to existing facilities, which are required to be occupied during construction. Life safety systems serving the existing building must be maintained. Typically, extension of the existing fire alarm is not feasible, resulting in two systems. As the strobes may not be synchronized, it is important to maintain visual separation between the two systems.

 

Najafi: It is always a challenge upgrading an existing electrical service. On a recent elementary school modernization project for the District of Columbia Public School System, we needed to upgrade an existing 800 amp service to 1600 amp. What made the task daunting was the need to install the new board in the same basement location as the existing board. The room was very tight with only a 9-ft ceiling space. To make things more complicated, the underground utility service also needed to be upgraded, and the entire 40,000-sq-ft renovation project had to be completed over the summer break. It took tremendous effort and coordination between the architect, the contractor, the local utility company, and the switchboard manufacturer to pull it off successfully.

 

Roy: One particular issue that comes to mind was when we provided design management services for a local school district and we indicated the engineer of record (EOR) had to add new local window-mounted air conditioning units as the old building did not easily accommodate a central air conditioning system. There was apparently a miscommunication between the EOR and the contractor (it was a design-build project) to correctly determine existing electrical load calculations, and as the window units were brought on line, numerous circuits overloaded and tripped. The EOR and the installing electrical contractor had to scramble to recheck circuit loading and provide new dedicated circuits. The challenge with renovation projects is that schools many times do not enforce proper as-builts from job order contracting contractors who come in and provide incremental stop-gap fixes and don’t update panel schedules. Over time, no one knows for sure what all is connected to which circuit. This happens more times than anyone wants to admit, and schools unfortunately keep letting this happen, much to everyone’s inconvenience and cost.

 

CSE: What types of renewable energy systems have you recently specified in a K-12 school? This may include photovoltaics, geothermal systems, etc.

 

Jefferson: We’re fortunate to live in one of the best states in the country for solar access. So even if we aren’t putting solar arrays into our projects on day one, we try to program future possibilities into the base design. Besides just leaving space or running conduit out of the electrical room, we’ve done solar shading studies to help optimize roof forms and ensure that we’re not diminishing the future value of that space for solar access.

 

Oathout: K-12 facilities have been an excellent partner for photovoltaic systems. DLR Group has been fortunate enough to be the design partner on several of these types of projects. The future for on-site renewables in the K-12 market continues to grow as the cost for these systems continues to go down and the desire for buildings to become net-zero increases.

 

Hedman: Most recent projects we have designed include ground source heat pumps, photovoltaics, domestic hot water solar collectors, and earth ducts.

 

Najafi: We have recently both specified and designed geothermal systems in K-12 schools. We are also currently designing two large high schools that will use geothermal systems, photovoltaics, and solar water heating coupled with rain water harvesting, variable refrigerant systems, high level lighting controls, and displacement ventilation to provide an overall high-performing building.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.