Engineering project management: Avoid thrashing

Automation System Integration Blog defines and explains how to avoid thrashing when managing an engineering project. Heed this advice and see the diagram example from Anthony Baker. Add your advice below.

10/07/2013


Diagram shows a root cause analysis/mind map of thrashing; sideways orientation on the web page allows for maximum size. Realizing how thrashing happens is the first step to avoidance. Courtesy: Callisto Integration, Control Engineering Automation SystemEngineering project management requires careful quantifying of scope, attention to scope creep, and expectation management, as explained in recent posts. To tie this off there is one other topic that is worth noting: Thrashing. It’s a lot like it sounds. Like a fish out of water, flopping around while you are trying to hold it down, thrashing can also happen in system integration when your scope is so out of control that nobody seems to know what to do next. Unfortunately, like the fish, there are not a lot of great options at this point. The trick is to not get caught.

The picture at bottom is a root cause analysis/mind map of thrashing. (Sorry for the sideways post, but that allows the maximum size.) Realizing how this happens is the first step to using the tools to mitigate the risk of project thrashing. As a reference example:

It’s the final days of development, the team gets to the FAT (factory acceptance test), and the operator (whom nobody has ever met before) says, “There is NO way this will work. The process just doesn’t work that way.” What happened?

Follow the branches in the tree.

1) Why? The requirements exist, but the team (as a whole) does not understand them.

2) The operator knew what needed to be done, but the development team, or client contact, did not.

3) Why? Requirements exist but have not been communicated.

4) The example is a classic case of “nobody asked the operator.” It is a communication breakdown.

5) Planning (see the green flag in the diagram): If the team had planned earlier to bring in the operator, this could have been avoided. A well-circulated functional design specification (FDS) or a project road map that included “ask the operators” would have avoided this.

And so on.

Think through the last two or three times you have experienced thrashing in your projects. Was it a late design change that nobody understood? Perhaps the requirements you agreed to were not supported by the technology, and you had to adjust. Maybe a team member changed groups (internally or externally). Get out the map and take a look. It will probably show you how it happened, and what you might do to avoid it in the future/get back on track.

Engineering interaction: Have additional project management advice? Use the comment box at the bottom to add to the list based on your experiences.

- The Automation System Integration Blog aggregates expert advice from Callisto Integration, providing manufacturing consulting and systems integration. This blog provides integration advice in plant-floor controls, manufacturing execution systems (MES), and manufacturing consulting, from the factory floor through to the enterprise. Andrew Barker, P.Eng., Callisto Integration, compiled the advice. www.callistointegration.com

Callisto Integration is a CSIA member as of 3/1/2015

See other Automation System Integration Blog postings linked below.

Diagram shows a root cause analysis/mind map of thrashing; sideways orientation on the web page allows for maximum size. Realizing how thrashing happens is the first step to avoidance. Courtesy: Callisto Integration, Control Engineering Automation System

Diagram shows a root cause analysis/mind map of thrashing; sideways orientation on the web page allows for maximum size. Realizing how thrashing happens is the first step to avoidance. Courtesy: Callisto Integration, Control Engineering Automation System



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Motor specification guidelines; Understanding multivariable control; Improving a safety instrumented system; 2017 Engineers' Choice Award Winners
Selecting the best controller from several viewpoints; System integrator advice for the IIoT; TSN and real-time Ethernet; Questions to ask when selecting a VFD; Action items for an aging PLC/DCS
Robot advances in connectivity, collaboration, and programming; Advanced process control; Industrial wireless developments; Multiplatform system integration
Motion control advances and solutions can help with machine control, automated control on assembly lines, integration of robotics and automation, and machine safety.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Future of oil and gas projects; Reservoir models; The importance of SCADA to oil and gas
Big Data and bigger solutions; Tablet technologies; SCADA developments
SCADA at the junction, Managing risk through maintenance, Moving at the speed of data
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Jose S. Vasquez, Jr.
Fire & Life Safety Engineer; Technip USA Inc.
click me