Environmental Services Laboratory Relocation

New construction: Environmental Services Laboratory Relocation; Erdman Anthony

08/09/2012


The completed South Florida Water Management District Building project is shown. (Click to enlarge)Project name: Environmental Services Laboratory Relocation

Location: West Palm Pearch, Fla.

Firm name: Erdman Anthony

Project type, building type: New construction, research/lab/high-tech

Project duration: 2.5 years

Project completion date: Feb. 29, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $4.2 Million

This photo shows the exhaust vents on the roof. (Click to Enlarge)Engineering challenges

Challenge 1: The owner desired to equip the building with a generator sized to provide backup electrical power for the entire building, including HVAC and those systems necessary to sustain normal operations. The challenge in achieving this requirement was to balance the cost of providing a generator sized to withstand the inrush associated with the simultaneous restart of motor-driven equipment with that of a generator sized to handle just steady-state loading.

Challenge 2: Another challenge was to devise a lighting control system that could execute a complex scheme whereby traditional manual switching was required during normal operating hours and automatic control, using occupancy sensors, was desired during off hours.

Solutions

Solution 1: After evaluating the cost of both options, the design team settled on a generator with a lower rating sized basically to handle only the steady state loads. The inrush issue was resolved by providing a control scheme, implemented via the BAS, which would stagger the restart of major equipment upon transfer to generator power. This solution not only reduced the upfront cost of the backup power system but also minimized the overall space required for the system.

Solution 2: To achieve this, local lighting controllers were used on each floor, which not only achieved the desired functionality but also provided the owner with the luxury of making future control changes via simple programming without the need for rewiring.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.