European Commission: plan for 20% energy efficiency by 2020

Experts question viability of 'timid' EU energy plan, with few provisions for energy-efficient buildings.

03/10/2011


The European Commission launched its calculations onAlliant Energy Corp. Bent Tree Wind Farm how to reach a 20% increase in energy efficiency by 2020 but as it did so, senior policy figures were questioning the math.

Around 40% of the current energy efficiency gap should be covered by a national energy saving obligation scheme that will yield savings of up to 100 million tons of oil a year by 2020, diplomats say. Another 30% will come from the roll out of legislation to ensure performance-based energy contracting and the rest from measures such as a requirement for public authorities to refurbish at least 3% of their buildings each year. New legislation is also promised on eco-design labeling for windows, and “split incentive” situations in which tenants and landlords are reluctant to pay for energy savings.

But in the absence of national sectoral targets to weigh the progress of these measures, one former policy director said it was “far too timid” and that it was "wishful thinking" to imagine they would bring the desired outcome.

Energy consultant Randall Bowie was particularly concerned that the 3% target for building renovations lacked detail and only applied to the public sector, which is only 12% of Europe's building stock. Bowie said, "There's a need for the member states to be required to develop long-term building renovation targets. You have to address the private sector more carefully and they haven't done that. By leaving it out they make it more difficult to reach the 2050 objective."

In January, Commission President José Manuel Barroso called for "concrete steps" to meet the EU's target. Many expected firm legal targets to be announced this year. But the document only proposes to review whether these are necessary at the end of 2013.

Energy efficiency is one of the EU's three 20-20-20 targets for the decade, along with increasing the use of renewable energies to 20% of its overall energy mix and reducing greenhouse gas emissions by 20%.

Unlike the other two goals, energy efficiency targets are not legally binding and in January, Barroso blamed this for the fact that it was the only goal not being met. Commission documents forecast average energy savings of only around 10% by 2020, with the UK on track for 9% and even Germany only likely to hit 14%.

- Edited by Bettina Chang, Consulting-Specifying Engineer, www.csemag.com



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.