Fieldbus Foundation enhances physical layer specifications

Updates to H1 physical layer specifications promote better device installation and integration.

06/02/2011


The Fieldbus Foundation has announced enhancements to its open, non-proprietary Foundation fieldbus physical layer technology. The latest updates to the H1 (31.25 kbit/s) physical layer specifications will improve the robustness of fieldbus control systems by optimizing device interoperability and integration. End users will benefit from easier installation, faster commissioning and seamless startups.

Enhancements to the Foundation fieldbus specifications include:

  • Addition of a test procedure for isolated couplers to the existing Foundation fieldbus Coupler Test Specification. Registration of isolated couplers is now possible.
  • Improvements to the H1 Physical Layer Conformance Test Specification based on Action Requests received during the last few years. The most significant changes include the addition of a receive jitter test case and a device-coupler interoperability test.
  • Updates to the H1 Physical Layer Test Specification to remove obsolete profiles and align new references in the document with the current International Electrotechnical Commission (IEC) specifications. Coupler profiles were also added to the test specification.
  • Miscellaneous updates to the Foundation fieldbus Cable Specification.

Fieldbus Foundation Director-Fieldbus Products Stephen Mitschke commented, "The Fieldbus Foundation's rigorous interoperability test and registration procedures thoroughly examine all aspects of a fieldbus device. The latest enhancements to our physical layer specifications will strengthen this testing and provide end users with greater confidence that registered Foundation fieldbus devices can be employed in a tightly integrated, interoperable control system architecture."

Implementation of the new Foundation fieldbus H1 Physical Layer Test Specification Version 2.0 is not immediately required. However, fieldbus device developers are encouraged to start using the specification as soon as possible. The updated specification will become mandatory with the next major release of the Fieldbus Foundation's Interoperability Test Kit (ITK). Until then, developers can still provide proof of conformance to Version 1.5 of the specification when registering a device.

www.fieldbus.org

Fieldbus Foundation

See more industrial network news, products, and feature articles at www.controleng.com/networks.

Also www.controleng.com/wireless.

And the Fieldbus Facts Newsletter: http://www.controleng.com/index.php?id=3108.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Intelligent, efficient PLC programming: Cost-saving programming languages are available now; Automation system upgrades; Help from the cloud; Improving flow control; System integration tips
Smarter machines require smarter systems; Fixing PID, part 3; Process safety; Hardware and software integration; Legalities: Integrated lean project delivery
Choosing controllers: PLCs, PACs, IPCs, DCS? What's best for your application?; Wireless trends; Design, integration; Manufacturing Day; Product Exclusive
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.
This article collection contains several articles on improving the use of PID.
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors
Cyber security cost-efficient for industrial control systems; Extracting full value from operational data; Managing cyber security risks
Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again