Fieldbus Foundation enhances physical layer specifications
Updates to H1 physical layer specifications promote better device installation and integration.
The Fieldbus Foundation has announced enhancements to its open, non-proprietary Foundation fieldbus physical layer technology. The latest updates to the H1 (31.25 kbit/s) physical layer specifications will improve the robustness of fieldbus control systems by optimizing device interoperability and integration. End users will benefit from easier installation, faster commissioning and seamless startups.
Enhancements to the Foundation fieldbus specifications include:
- Addition of a test procedure for isolated couplers to the existing Foundation fieldbus Coupler Test Specification. Registration of isolated couplers is now possible.
- Improvements to the H1 Physical Layer Conformance Test Specification based on Action Requests received during the last few years. The most significant changes include the addition of a receive jitter test case and a device-coupler interoperability test.
- Updates to the H1 Physical Layer Test Specification to remove obsolete profiles and align new references in the document with the current International Electrotechnical Commission (IEC) specifications. Coupler profiles were also added to the test specification.
- Miscellaneous updates to the Foundation fieldbus Cable Specification.
Fieldbus Foundation Director-Fieldbus Products Stephen Mitschke commented, "The Fieldbus Foundation's rigorous interoperability test and registration procedures thoroughly examine all aspects of a fieldbus device. The latest enhancements to our physical layer specifications will strengthen this testing and provide end users with greater confidence that registered Foundation fieldbus devices can be employed in a tightly integrated, interoperable control system architecture."
Implementation of the new Foundation fieldbus H1 Physical Layer Test Specification Version 2.0 is not immediately required. However, fieldbus device developers are encouraged to start using the specification as soon as possible. The updated specification will become mandatory with the next major release of the Fieldbus Foundation's Interoperability Test Kit (ITK). Until then, developers can still provide proof of conformance to Version 1.5 of the specification when registering a device.
Fieldbus Foundation
See more industrial network news, products, and feature articles at www.controleng.com/networks.
Also www.controleng.com/wireless.
And the Fieldbus Facts Newsletter: http://www.controleng.com/index.php?id=3108.
Integrator Guide
| Search the online Automation Integrator Guide |
|
|
|
|
Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.
Case Study Database
Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.















