Fine-tuning your alarm management system

Sometimes the biggest obstacles to effective alarm management are cultural, not technical.

06/05/2012


Real-world Engineering BlogIn the wake of the Deepwater Horizon disaster, alarm management has moved once again into the forefront for many companies as they ask: “What is the best way to keep an operator from missing a key alarm when things start to go wrong? What are the obstacles to having an effective alarm management system?” In my experience, the decision to have, or not have, an alarm is more often cultural than it is based on a good operational analysis of the process. That’s why the alarm rationalization process is so necessary and beneficial. It strips away the cultural, “I want the operator to know about…” and replaces it with, “This is the most important thing the operator has to do.”

 

Many plant personnel do not appreciate just how significant this change is. Almost from the introduction of the DCS, its ability to generate more alarms than a human can effectively deal with was not appreciated by non-operators. Engineers and plant managers wanted the operators to know everything that was happening in their unit with the end result being just the opposite, particularly in upset situations. The DCS suppliers eventually gave us the tools to do conditional alarming which, for the most part, went unused by the typical project execution team because it wasn’t part of the scope. Process designers felt that every measurement should have the full suite of alarms and no one had the brief to question that. But things are changing.

 

ISA 18.2 outlines a methodology for developing an effective alarm management system by first requiring the plant to create an alarm philosophy document that defines the criteria for rating an alarm’s severity and urgency. The typical document classifies four levels of severity based on safety, environmental impact, or financial impact, and four levels of urgency based on how quickly the operator has to take a corrective action. A required operator response, other than to acknowledge that the alarm occurred, is a significant paradigm shift for most plants as a high percentage of current alarms are really for operator notification, often about something for which there is no corrective action. When one of the more catastrophic of those occur, all the operators can do is sit back, watch the flood of alarms resulting from the event that couldn’t be prevented in the first place, and, of course, wear out the horn acknowledge button.

 

The final solution rests with the management of the facilities, because ultimately it costs money to do the work required to implement and maintain a good alarm management system. It has to be in the culture of the facility that safety is a priority or the time and money required won’t be allocated. It also has to be in the culture that an alarm requires the operator to take a corrective action to prevent an undesirable incident.

 

Also read:

 

Managing alarms using rationalization, and

 

A rational approach to alarm rationalization

 

This post was written by Bruce Brandt. Bruce is the DeltaV technology leader at MAVERICK Technologies, a leading system integrator providing industrial automation, operational support and control systems engineering services in the manufacturing and process industries. MAVERICK delivers expertise and consulting in a wide variety of areas including industrial automation controls, distributed control systems, manufacturing execution systems, operational strategy, and business process optimization. The company provides a full range of automation and controls services – ranging from PID controller tuning and HMI programming to serving as a main automation contractor. Additionally MAVERICK offers industrial and technical staffing services, placing on-site automation, instrumentation and controls engineers. 



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.