First Solar ranked largest photovoltaic EPC in 2012

For the first time, First Solar became the world's largest photovoltaic EPC contractor in 2012, with more than 500 MW of projects completed.

05/15/2013


IMS Research (acquired by IHS, Inc.)For the first time, First Solar became the world’s largest photovoltaic (PV) engineering, procurement and construction (EPC) contractor in 2012, with more than 500 MW of projects completed – an increase of 50% over 2011, according to a new report from IMS Research, now part of IHS Inc. The report also revealed that a major shift in global rankings occurred in 2012 due to the explosive growth witnessed in Asia and the Americas at the expense of Europe. Just four European EPCs appeared in IHS' top 10 rankings for 2012.

U.S. companies come out on top

Two other US-based EPCs – SunEdison and SunPower also featured in the top fifteen, installing 390 and 190 MW, respectively.

"Because of the dramatic shift in demand away from Europe, non-European companies are now completing vast numbers of PV projects around the world. Last year, just four of the top 10 EPCs and system integrators were based in Europe due to the large project business of US, Chinese and Indian companies. Back in 2010, seven of the top 10 EPCs were European," said Ash Sharma, senior director of solar research at IHS.

First Solar and SunEdison were found to have benefitted from the huge utility-scale PV pipeline being constructed both in the US and many other countries over a number a years, including the 550 MW Topaz Solar Farm and the 290 MW Agua Caliente Solar Project.

The rise of Asia

Asian EPCs also featured heavily again in the 2012 rankings, most notably Chinese companies linked to state-owned utilities and industrial companies that benefited from massive domestic demand in ground-mount projects.

"Four of the 10 largest EPCs last year were Chinese companies. There were another eight that appeared in the top 30. These companies are likely to see continued gains as their domestic market continues to grow rapidly and the Chinese market remains largely impenetrable to foreign firms," said Sharma.

Interestingly, an Indian company, Larsen & Toubro, appeared in the top 10 ranking for the first time.  Larsen & Toubro is estimated to have completed nearly 200 MW of projects in 2012, nearly double the amount completed the year before. Like their Chinese counterparts, Indian EPCs remain in an excellent position to capitalize on the high growth of domestic ground-mount projects.

European EPCs Won’t Disappear

Despite European EPCs slipping down the rankings, the vast majority of PV EPC and system integrators are still located in Europe. In fact, 11 of the 30 largest EPCs last year were European, installing 2 GW of new capacity between them. These same companies are also becoming increasingly active in new emerging markets around the world including Latin America and Asia.

"Despite all of the dramatic changes in the EPC landscape in 2012, one thing remains constant: the industry remains incredibly fragmented. First Solar's EPC business represented just 2% of the total market and the top 30 EPCs only accounted for 24% of the global projects business – roughly the same as 2011," said Sharma.

IMS Research’s quarterly tracker "EPC & Integrator Market Shares & Projects" features markets shares and rankings by country and installation type and profiles of more than 600 EPCs and close to 10,000 PV projects around the world.

Source: IMS Research (acquired by IHS, Inc.)



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.