East Bank office tower lobbyProject name: Flats East, LLC Mixed Use Development

Location: Cleveland, Ohio

Firm name: Thorson Baker and Associates Inc.

Project type, building type: New construction, office

Project duration: 2 years

Project completion date: December, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $43.5 million

Engineering challenges

The Flats East Mixed-Use Development Project is located on the waterfront, directly in the heart of the East Bank. The addition of this multi-use building to the city of Cleveland will act as a platform for new development of restaurants, hotels, retail, sporting events, recreational activities, and nightlife. Based on the project’s location, this destination will merge many forms of entertainment and provide an attraction for local and out-of-town guests.

Main electrical vault under construction Flats East BankThis $145,000,000+ project consists of approximately 820,000 sq ft of mixed-use space, including three stories of parking podium (approximately 225,000 sq ft) supporting a 19-story high-rise office tower (approximately 450,000 sq ft) and eight stories of high-rise hotel (150 rooms), restaurants, and fitness (approximately 120,000 sq ft). Three major tenants for this project include the Aloft Hotel, Ernst & Young, and Tucker Ellis. This is a registered U.S. Green Building Council LEED V3 project, targeting LEED Silver certification, and reinforces the Thorson Baker and Associates Inc. (TBA) experience in sustainable design.

Seventeen additional TBA projects have received LEED certification and 40 additional projects are registered and on track to receive certification. The design process started with TBA working for the architect, directly for the owner in a design-assist process along with the construction team, including the MEP prime subcontractors. Initial indications were that the project was $30 million over the project budget, so the design team had to come up with an effective solution to meet the needs and goals for the project.

15th-floor view of Cleveland skyline from the Office Tower FlatsSolutions

A few months into the design process, the delivery method changed to a GMP (guaranteed maximum price) process, where the MEP contractors were bid and locked into a GMP based on 50% complete construction documents. The $30M budget gap was closed and allowed the project to successfully move forward. Once the construction team was finalized, TBA was contracted through the architect to work as a team for the construction manager to complete the construction documents and follow through with construction administration. TBA has been able to successfully manage the expectations of both clients throughout the process while maintaining the integrity of the design with no increase in construction cost. 

Exterior elevation under construction Flats East BankMain mechanical room HVAC piping isometric diagram Flats East Bank



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.