Flats East, LLC Mixed Use Development

New construction: Flats East, LLC Mixed Use Development; Thorson Baker and Associates Inc.


East Bank office tower lobbyProject name: Flats East, LLC Mixed Use Development

Location: Cleveland, Ohio

Firm name: Thorson Baker and Associates Inc.

Project type, building type: New construction, office

Project duration: 2 years

Project completion date: December, 2012

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $43.5 million

Engineering challenges

The Flats East Mixed-Use Development Project is located on the waterfront, directly in the heart of the East Bank. The addition of this multi-use building to the city of Cleveland will act as a platform for new development of restaurants, hotels, retail, sporting events, recreational activities, and nightlife. Based on the project’s location, this destination will merge many forms of entertainment and provide an attraction for local and out-of-town guests.

Main electrical vault under construction Flats East BankThis $145,000,000+ project consists of approximately 820,000 sq ft of mixed-use space, including three stories of parking podium (approximately 225,000 sq ft) supporting a 19-story high-rise office tower (approximately 450,000 sq ft) and eight stories of high-rise hotel (150 rooms), restaurants, and fitness (approximately 120,000 sq ft). Three major tenants for this project include the Aloft Hotel, Ernst & Young, and Tucker Ellis. This is a registered U.S. Green Building Council LEED V3 project, targeting LEED Silver certification, and reinforces the Thorson Baker and Associates Inc. (TBA) experience in sustainable design.

Seventeen additional TBA projects have received LEED certification and 40 additional projects are registered and on track to receive certification. The design process started with TBA working for the architect, directly for the owner in a design-assist process along with the construction team, including the MEP prime subcontractors. Initial indications were that the project was $30 million over the project budget, so the design team had to come up with an effective solution to meet the needs and goals for the project.

15th-floor view of Cleveland skyline from the Office Tower FlatsSolutions

A few months into the design process, the delivery method changed to a GMP (guaranteed maximum price) process, where the MEP contractors were bid and locked into a GMP based on 50% complete construction documents. The $30M budget gap was closed and allowed the project to successfully move forward. Once the construction team was finalized, TBA was contracted through the architect to work as a team for the construction manager to complete the construction documents and follow through with construction administration. TBA has been able to successfully manage the expectations of both clients throughout the process while maintaining the integrity of the design with no increase in construction cost. 

Exterior elevation under construction Flats East BankMain mechanical room HVAC piping isometric diagram Flats East Bank

No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Machine design tips: Pneumatic or electric; Software upgrades; Ethernet advantages; Additive manufacturing; Engineering Leaders; Product exclusives: PLC, HMI, IO
Industrial wireless cyber security: More complex than black and white; IIoT at the I/O level; Process modeling; Cyber security research
Robotic advances: Software, form factors; System-based ROI; Embedded control; MES and information integration; SCADA and cyber security; Position sensor; Controller, I/O module
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Drilling for Big Data: Managing the flow of information; Big data drilldown series: Challenge and opportunity; OT to IT: Creating a circle of improvement; Industry loses best workers, again
Pipeline vulnerabilities? Securing hydrocarbon transit; Predictive analytics hit the mainstream; Dirty pipelines decrease flow, production—pig your line; Ensuring pipeline physical and cyber security
Cyber security attack: The threat is real; Hacking O&G control systems: Understanding the cyber risk; The active cyber defense cycle