Follow precedence when demoting an employee

Machine Repairman Grade II Ed Crowley was hired in June by Maintenance Supervisor Jack Andrews.

03/01/1998


Machine Repairman Grade II Ed Crowley was hired in June by Maintenance Supervisor Jack Andrews. Although his performance was marginal at best, he survived his 30-day probationary period only because the department was in a state of disruption, and Andrews was too busy or confused to monitor his work.

Crowley's performance continued to be marginal or worse. About 4 mo after his date of hire, Andrews resigned and was replaced by a new supervisor, Bill Shapper. Shapper was a good man, but it took him 2 mo or more to learn his job and become familiar with its requirements. At this point, he began to reorganize the maintenance department.

It was thus more than 6 mo before Shapper got around to reviewing Crowley's job sheets and performance.

He confided to his assistant, "This guy never should have been kept beyond his probationary period."

"I know, but that wasn't my decision to make."

"What to do with him now is the decision to make."

Shapper summoned Crowley to his desk and reviewed his performance record with him. Crowley had no comment to make.

"Ed, I'm sorry I have to do this, but I'm moving you a step down to Mechanic Grade II," Shapper said.

Crowley scowled. He knew this move entailed a lower wage rate and lower level work.

Crowley protested, "That's in violation of the labor agreement. The Manual states that prior to terminating or demoting an employee, remedial measures must be applied to improve his performance. I was never put into a training program or anything."

Shapper discussed Crowley's response with his assistant, who felt the employee might have a point. "The Manual does call for a Corrective Action Plan."

"The policy makes sense," Shapper said. "But it would be hopeless in Crowley's case. No way could his performance be improved. It would be a waste of money and time."

He put through the demotion notice. Crowley promptly responded by grieving.

Question : How do you rate Shapper's chance of making the demotion stick?

Plant engineer's decision: When Plant Engineer Carl Barcley was apprised of the details, he advised Shapper to rescind the demotion and enroll Crowley in a training program, with his future job classification dependent on the outcome.

"When procedures are preestablished for dealing with substandard performance, whether an employee is judged hopeless or not, you have no choice but to follow them."





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.