HOK/Vanderweil wins Next Generation Design Competition

A team of engineers from HOK and Vanderweil won the award from Metropolis magazine for their proposal in retrofitting a 1960s building using new energy.

06/06/2011


A team of architects and engineers from HOK and Vanderweil Engineers won Metropolis Magazine’s Next Generation Design Competition. Their proposal, titled “Process Zero: Retrofit Resolution” was designed to retrofit a Los Angeles federal building owned by the General Services Administration (GSA) designed in the 1960’s using new energy solutions.

The Washington, D.C.-based team’s proposal demonstrated how the building used in their proposal could yield an 84% reduction in overall energy demand through energy conservation and renewal. On-site energy generation—used via a modular system of algae tubes designed to absorb the sun’s radiation for energy production on the building’s façade—would supply the remaining 16%. The proposal also includes a 25,000-square-foot microalgae bioreactor system able to generate 9% of the building’s power supply once the retrofit is complete.”

Some of the highlights in the proposal include:

  • Radiant floor heating
  • Geothermal cooling
  • Rainwater harvesting
  • Energy recovery mechanical ventilation
  • Phase-changing insulation material in ceilings to help extend natural ventilation periods
  • Daylight controls to reduce artificial lighting energy consumption by 75%.

These new energy proposals and concepts were what won over the Next Generation jury, giving the 15-person Washington, D.C., team the top prize.

Metropolis magazine featured the winning proposal in the May 2011 issue.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.