How often should PM strategies and tasks be reviewed?

The question is often asked "how often should PM strategies and tasks be reviewed?" Here are 3 processes an organization should have in place to support PM reviews.

06/29/2012



The question is often asked "how often should PM strategies and tasks be reviewed?" Here are three processes an organization should have in place to support PM reviews.

1. Root cause analysis (RCA) review: Each time an RCA is performed on failed equipment a review of the maintenance strategy should also be performed. The review of the maintenance strategy including the PM tasks should determine if a task exists that is supposed to prevent or identify early the incipient failure that ultimately led to the failure of the equipment.

If a task exists it should be determined if the task was performed properly. If the task was performed properly then the task should be changed as its ineffective. If the task was not performed properly then training should be provided to so that the task will be performed properly in the future. If no task exists then one should be developed and added to the PM procedure and the maintenance strategy updated.

2. Maintenance tech feedback: Feedback from the maintenance techs can be a valuable source of information. If the maintenance techs provide information or suggestions on how to improve a task it should be reviewed by the technical authority (discipline engineer) to ensure effectiveness.

3. Five-year PMO review: Industry best practice suggests that a formal review of all PM routines should take place every five years. The formal review is sometimes called PM Optimization. This is the minimum requirement in Marshall Institutes estimation.

- Some oil industry maintenance and integrity standards require a review every five years. Of course they use SCRM or derivative of it. Their standards for RCM are less rigorous than some industries like the nuclear power industry.

- John Moubray, author of RCM II, suggests a review every 12-24 months for critical equipment and up to three years for less critical.

- Anthony Smith, author of RCM: Gateway to World-Class Maintenance, recommends a first review at 18-24 months and then every three years after that.

- Steve Turner, well known RCM practitioner from aviation industry, and owner/creator of a preventive maintenance optimization process in Australia recommends minimum every three years.

- The Society of Maintenance and Reliability Professionals in the U.S. recommends every three years.

- Marshall Institute’s experience and observations of companies in industry suggests that a review every five years is the minimum for most equipment and operating contexts.

My key point is that maintenance strategies need to be reviewed periodically. If the organization understands the risks and has history to support their decisions they should be able to determine an acceptable frequency for reviews.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
System integration: Best practices and technologies to help; Virtualization virtues; Cyber security advice; Motor system efficiency, savings; Product exclusives; Road to Hannover
Collaborative robotics: How to improve safety, return on investment; Industrial Internet of Things, Industrie 4.0: World views; High-performance HMI, Information Integration: OPC and OMG
9 tips: How to integrate a servo system; Process control mathematical models; Serial network grounding; Engineers' Choice Awards; Learn from cyber security mistakes
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.
Learn how Industry 4.0 adds supply chain efficiency, optimizes pricing, improves quality, and more.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
Special report: U.S. natural gas; LNG transport technologies evolve to meet market demand; Understanding new methane regulations; Predictive maintenance for gas pipeline compressors

(copy 5)

click me