Incomplete testing and lack of design review

This police headquarters required an overhaul of its air handlers, building automation system, and lighting system.

12/27/2013


Due to the high energy use at this all-electric police building, exp U.S. Services was brought in to perform retro-commissioning and assess the problems and potential for energy savings. This large, 12-year-old, 5-story building houses the administrative offices for the police department, which was supposedly occupied 24/7. In reality, only a small portion of the building is occupied continuously. Two large air handling units (AHUs) serve the entire building through variable air volume (VAV) and fan-powered boxes (FPBs).

During the inspection, 20 of the 100 perimeter FPBs were found inoperative. These boxes are the only source of heat, and tenant comfort issues were common. Further investigation revealed some incorrect coding in the building automation system (BAS) programming was permanently holding these boxes in “unoccupied” mode. This error was corrected quickly, and all boxes began functioning properly. Although this was not directly an energy conservation item, it allowed the building operators to shut off the AHUs during winter nights because the FPBs would operate independently, and provide heat as needed. It appears that the BAS programming for these particular boxes was overlooked during the initial start-up of the HVAC systems.

The lighting in the building is adequate, and reasonably efficient fixtures were used, but at some point during design, the wall-mounted light switches were “value-engineered” out of the building. The theory was because the building would be occupied 24/7, the lights would never be off, and the switches were superfluous. In reality, only a small portion of the building is occupied continuously and the lights are left on 24/7, wasting large amounts of energy. Area-wide lighting controllers were installed, but subsequently taken out of service due to complaints of lights going off at the wrong times or other problems.

It seems that the proper design review by the CxA would have addressed this issue, and perhaps suggested an alternative design, such as occupancy sensor light switches that would control the local lighting and avoid the current energy waste. exp’s recommendation was to install an occupancy-sensing switch for each lighting circuit in the building. Although a costly option, the annual savings are 1,440,000 kWh and $102,000 for a payback of less than 1 year. 


Terrence Malloy is project manager for the energy solutions group at exp US Services Inc. He focuses on energy conservation, retro-commissioning, and renewable energy systems.



Anonymous , 01/03/14 07:26 PM:

From my experience as a CxA on such projects, I can say with certainty that design review comments coming from a CxA are mostly ignored or forgotten by the design team. They simply don't seem to be able to evaluate and integrate well. They are in the processing mode to get out a design package.
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Engineering Leaders Under 40; System integration improving packaging operation; Process sensing; PID velocity; Cybersecurity and functional safety
Mobile HMI; PID tuning tips; Mechatronics; Intelligent project management; Cybersecurity in Russia; Engineering education; Road to IANA
Save energy with automation; Process control system upgrades; Dispelling controll myths; Time-sensitive networking; Control system integration; Road to IANA
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Flexible offshore fire protection; Big Data's impact on operations; Bridging the skills gap; Identifying security risks
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
click me