Incomplete testing and lack of design review

This police headquarters required an overhaul of its air handlers, building automation system, and lighting system.

12/27/2013


Due to the high energy use at this all-electric police building, exp U.S. Services was brought in to perform retro-commissioning and assess the problems and potential for energy savings. This large, 12-year-old, 5-story building houses the administrative offices for the police department, which was supposedly occupied 24/7. In reality, only a small portion of the building is occupied continuously. Two large air handling units (AHUs) serve the entire building through variable air volume (VAV) and fan-powered boxes (FPBs).

During the inspection, 20 of the 100 perimeter FPBs were found inoperative. These boxes are the only source of heat, and tenant comfort issues were common. Further investigation revealed some incorrect coding in the building automation system (BAS) programming was permanently holding these boxes in “unoccupied” mode. This error was corrected quickly, and all boxes began functioning properly. Although this was not directly an energy conservation item, it allowed the building operators to shut off the AHUs during winter nights because the FPBs would operate independently, and provide heat as needed. It appears that the BAS programming for these particular boxes was overlooked during the initial start-up of the HVAC systems.

The lighting in the building is adequate, and reasonably efficient fixtures were used, but at some point during design, the wall-mounted light switches were “value-engineered” out of the building. The theory was because the building would be occupied 24/7, the lights would never be off, and the switches were superfluous. In reality, only a small portion of the building is occupied continuously and the lights are left on 24/7, wasting large amounts of energy. Area-wide lighting controllers were installed, but subsequently taken out of service due to complaints of lights going off at the wrong times or other problems.

It seems that the proper design review by the CxA would have addressed this issue, and perhaps suggested an alternative design, such as occupancy sensor light switches that would control the local lighting and avoid the current energy waste. exp’s recommendation was to install an occupancy-sensing switch for each lighting circuit in the building. Although a costly option, the annual savings are 1,440,000 kWh and $102,000 for a payback of less than 1 year. 


Terrence Malloy is project manager for the energy solutions group at exp US Services Inc. He focuses on energy conservation, retro-commissioning, and renewable energy systems.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Big plans for small nuclear reactors: Simpler, safer control designs; Smarter manufacturing; Industrial cloud; Mobile HMI; Controls convergence
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.