Labeling program helps building owners save energy
The Building Energy Quotient assigns energy usage to building based on an in-operation assessment that includes an energy audit by ASHRAE.
Energy use is one of the highest operating costs for building owners. It is also the most controllable. To help owners reduce their energy costs, a new building labeling program is available that not only rates buildings according to the in-operation energy use but also provides owners with suggested measures that can improve energy efficiency.
The Building Energy Quotient (bEQ) program assigns to buildings an energy usage quotient based on completion of an in-operation assessment that includes an ASHRAE Level I Energy Audit. ASHRAE, a building technology society with more than 50,000 members worldwide, is the developer of bEQ.
bEQ was introduced two years ago as a pilot program with the intent of providing an easily understood scale to convey a building’s energy use in comparison to similar buildings and climate zones, while also providing building owners with building-specific information that highlights potential energy saving opportunities. Under the program, buildings are eligible to receive an In Operation rating as long as the building has at least 12 months of consecutive energy use data. The rating is based on the building and how it is operated.
- Edited by Chris Vavra, Consulting-Specifying Engineer, www.csemag.com
Integrator Guide
| Search the online Automation Integrator Guide |
|
|
|
|
Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.
Case Study Database
Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.















