LED work light WorkStar2000
Maxxeon Inc.'s third-generation WorkStar light includes a belt clip, a 12-volt charger, a 110-volt charger, and has a run time of up to 10 hours.
Maxxeon Inc. announced the advent of the WorkStar 2000, the third generation of cordless LED work lights developed by the company since the invention of the original WorkStar 1200 in 2003.
Company spokesman, John Schira, recently revealed the features of the new tool. “The WorkStar 2000 retains the multi-directional lighting head, but thanks to new technology, light output has been vastly increased. The MRO technician simply suspends the light by its hook or its magnets and turns the LED light head to direct the light where he wants it, leaving his hands free. Since the light head “stays put”, this solves another especially aggravating problem for industrial mechanics - trying to make repairs while the work light moves around and glares into their eyes. Features such as dual light level, integral magnets and retractable hook combine with the new, ergonomic design to make it the ideal work light in any shop.”
The light includes a belt clip to aid in portability, a 12 volt charger, a 110 volt charger, and has a connection in the base to allow mounting the product to a tripod. The light is rechargeable with a run time of up to 10 hours, and includes an LED charge indicator to make the operator aware of the state of the charge.
The WorkStar 2000 replaces the WorkStar 1400 work light, which is still in use in thousands of industrial maintenance shops across the country. The new work light will be available from industrial distributors in October.
- Edited by Chris Vavra, Plant Engineering, www.plantengineering.com
Integrator Guide
| Search the online Automation Integrator Guide |
|
|
|
|
Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.
Case Study Database
Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.















