May 1 Southland Industries update: CUP nearly complete

The central utility plant is currently 80% complete; the project team recently hung four Armstrong vertical inline 1,900 gpm chilled water pumps; the boiler flue gas economizers have been hung.

05/01/2013


As of May 1, 2013:

  • The central utility plant (CUP) is currently 80% complete (see Figure 1 in the slideshow below)
  • The project team recently hung four Armstrong vertical inline 1,900 gallons per minute (gpm) chilled water pumps (see Figure 2).
  • The boiler flue gas economizers have been hung and are awaiting boiler flue and boilers (see Figure 3).

Additional comments:

  • We will be circulating water in the chiller plant in the coming months and are awaiting delivery of the boilers in July.
  • Below are some interesting stats about the project that might be of interest. For your reference, much of the sustainable-conscious design used in the CUP helps attribute to the energy and water savings projected below.
    • 786,965 cfm AHU supply volume
    • 37,063,905 kWh annual electricity use, 11.7% savings over ASHRAE baseline
    • 39,697 therms annual natural gas use, 92.8 % savings over ASHRAE baseline
    • Overall 34.3% energy savings over ASHRAE baseline
    • 8,112,515 gal of water used per year, 40% savings over baseline
    • 46,864-MBH steam boiler plant
    • 5,422-ton chiller plant
    • 393,227 LF (74.5 miles) of pipe
    • 1,302,485 lbs (651.2 tons) of sheetmetal

Gary Lovewell is a senior project manager at Southland Industries.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.