Measuring success: How GM scores on energy

GM shows how they earned the Energy Star Challenge from the Environmental Protection Agency

04/15/2013


General Motors has earned the Energy Star Challenge for Industry from the U.S. EPA. Among the statistics that led to that designation:

  • In 2012, GM improved the energy efficiency of U.S. operations by 11% over 2011, and saved $20 million in energy costs.
  • The 280,000 metric tons of avoided carbon dioxide emissions is equivalent to annual emissions from 52,900 passenger vehicles. GM’s goal is to reduce energy intensity from all of its U.S. facilities by 20% by 2020.
  • The resulting CO2 equivalent reduction of 1,256,000 metric tons is equal to the electricity needed to power more than 142,069 homes annually or provide electricity to a city about the size of New Orleans for one year.
  • Tracking energy use on a real-time basis for U.S. manufacturing sites resulted in nearly 2.5 million points of energy data, which are monitored every minute to create real-time energy performance indicators.
  • Managing energy in its operations by retro-commissioning two assembly plants’ heating, ventilation, and air conditioning systems saved $5 million in 2012, and applying similar processes elsewhere in the United States will save $3 million.
  • GM’s 54 facilities cut energy intensity by an average of 26% within just two to three years. 

(Source: General Motors)



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.