Missouri University of Science and Technology (MS+T) Campus Geothermal Energy System

Existing sytem retrofit; Missouri University of Science & Technology (MS&T) Campus Geothermal Energy System; McClure Engineering

08/15/2013

Flash is required!

Engineering firm: McClure Engineering
2013 MEP Giants rank:
95
Project:
Missouri University of Science & Technology (MS&T) Campus Geothermal Energy System
Address:
Rolla, Mo., United States
Building type:
School (college, university)
Project type:
Other
Engineering services:
Automation & Controls, Code Compliance, Cx/Retro-Cx, Electrical/Power, HVAC
Project timeline:
October 2010 to June 2014
Engineering services budget:
$2.5 million
MEP budget:
$2.5 million

Challenges

The first challenge faced by McClure Engineering was choosing the type of system to best suit the campus's heating and cooling needs, as well as its desire for energy efficiency, minimal carbon footprint, and reduced energy costs. To find the best solution, McClure created an hour-by-hour energy model of the campus and modeled various options. The model was compared to metered data to verify its accuracy.

The project includes removing the old steam system and connecting 15 campus buildings to three central heating systems. The challenge was the conversion of all of the existing buildings to the new heating system (a low-temperature, 120 F system) as they were originally designed with other operating parameters. Because each building is unique, McClure examined them individually (on paper and on-site) to determine the optimal ways to make the systems work together.

The project summary and campus schematic from the Missouri University of Science & Technology project are shown. Courtesy: McClure EngineeringMcClure is currently facing the ongoing challenge of phasing the construction of the entire project, which includes work in existing buildings, construction of new heating/cooling plants, and miles of geothermal piping. Complications include coordinating the work of several subcontractors, minimizing the disruptions to the campus and building occupants, weather delays, and supplying heating and cooling to as much of the campus as possible while installations are completed.

Solutions

The ground source heat pump system was chosen for its ability to store rejected heat in the ground during the summer and use that heat for building heating during the winter. A unique feature of this design was the decision to utilize a hybrid system (with gas-fired boilers and existing electric chillers to shave the peak loads), which greatly reduced the number of wells required, enabled the project to fit within the university's budget, and provided redundancy in both the heating and cooling systems.

For heating, in many cases the best solution was to replace the coils in air handlers and terminal units in the buildings to work with the new, low-temperature heating system. This allowed the design to maintain high water temperature differentials, thus keeping flows and pump horsepower to a minimum in the buildings and plants.

McClure works closely with the construction manager (JE Dunn), the scheduler (CCS Group), and the school (Missouri University of Science & Technology) to keep the project on schedule and the occupants comfortable through constant communication with all parties. The project team is utilizing a variety of project management tools (including iPads) to facilitate collaboration, effectiveness, and efficiency.

See a presentation from McClure Engineers here.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.