Caterpillar's XQ200 and XQ350 mobile diesel generator sets meet Tier 4 Interim emissions regulations.
Caterpillar Inc. has two mobile diesel generator sets that meet Tier 4 Interim emissions regulations. The XQ200 is rated for prime operation at 182 kW; the XQ350 is rated for prime operation at 320 kW. Equipped with the EMCP 4.2 control panel, both the XQ200 and XQ350 feature a user-friendly interface and auto-configuration of key performance parameters when voltage or frequency changes are required. The system senses changes and adjusts the parameters for optimum performance. The auto-configuration capability eliminates the time required and potential errors when reprogramming units. The units are in sound-attenuated containers, reducing noise while still maintaining the ambient and altitude performance at all ratings. The GFCI convenience receptacles on the back of the unit consistently run at 110 V, regardless of the voltage at the main loads bus terminal. The units also feature 30- and 50-amp connectors with twistlock connectors, suitable for powering a variety of electrical components.
Caterpillar Inc.
Integrator Guide
| Search the online Automation Integrator Guide |
|
|
|
|
Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.
Case Study Database
Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.
These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.
Click here to visit the Case Study Database and upload your case study.