Project name: Nalco Chemical Laboratory

Location: Sugar Land, Texas

Firm name: Redding Linden Burr Inc.

Project type, building type: Existing building retrofit, research/lab/high-tech

Project duration: 2 years

Project completion date: April 29, 2008

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $150,000

Engineering challenges

Engineering challenges faced on this laboratory conversion included: exhaust for 104 independently controlled chemical fume hoods in laboratory space; conversion of existing office space into laboratory space; and incorporating exhaust fans for chemical fume hoods.

Solutions

The engineering solutions used to resolve the three issues were as follows. The MEP system was designed to support 104 chemical fume hoods with an airflow lab tracking control system, with combination fume hood sash control to maintain proper lab pressurization control. The project converted existing office space on the second floor of a three-story structure to two chemistry laboratories with 36 fume hoods similar to the arrangement of the existing first-floor laboratory, which also has 36 fume hoods. In addition to this second- and first-floor labs, the mechanical system was sized for 18 future fume hoods in the existing training room area on the second floor, and 14 future fume hoods directly below on the first floor. The majority of the existing air handler equipment was reutilized; however, a new air handler with a capacity of 38,400 cfm needed to be included in the design to serve the exhaust requirements and additional first-floor fume hood requirements. New exhaust fans on the roof were sized to accommodate the new fume hoods on the second floor, the existing fume hoods on the first floor, and the future hoods described above. The chiller and boiler plants were modified to serve the air handling modifications and expansion to the laboratory. The exhaust fans consist of a fan assembly with five laboratory dilution fans with a total capacity of 100,000 cfm tying in all new and existing exhaust ducts to the manifold of the new fan assembly and demolishing the existing fans. The design incorporates ductwork for the future fume hoods.



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Sensor-to-cloud interoperability; PID and digital control efficiency; Alarm management system design; Automotive industry advances
Make Big Data and Industrial Internet of Things work for you, 2017 Engineers' Choice Finalists, Avoid control design pitfalls, Managing IIoT processes
Engineering Leaders Under 40; System integration improving packaging operation; Process sensing; PID velocity; Cybersecurity and functional safety
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

SCADA at the junction, Managing risk through maintenance, Moving at the speed of data
Flexible offshore fire protection; Big Data's impact on operations; Bridging the skills gap; Identifying security risks
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
click me