Navistar International Corporate Headquarters

Navistar International Corporate Headquarters; Environmental Systems Design Inc. (ESD)

08/09/2012


This was the existing CFD model of the fifth-floor perimeter condition. Subsequent iterations were performed to mitigate existing solar insolation deficiencies. Courtesy: ESD (Click to enlarge)Project name: Navistar International Corporate Headquarters

Location: Lisle, Ill.

Firm name: Environmental Systems Design Inc. (ESD)

Project type, building type: Other, office

Project duration: 1 year

Project completion date: Oct. 3, 2011

Project budget for mechanical, electrical, plumbing, fire protection engineering only: $42.8 million

Engineering challenges

Navistar International needed to consolidate its North American This CFD model shows the proposed perimeter mechanical and architectural modifications. Courtesy: ESD (Click to enlarge)headquarters and engineering centers from multiple office locations to one campus. Located in Lisle, Ill., the former Alcatel-Lucent campus consisted of approximately 1,200,000 sq ft in nine existing buildings. Environmental Systems Design Inc. (ESD) provided the consulting engineering design and construction field observation services necessary to successfully execute the consolidation. The project involved a mixture of existing buildings that required renovation, along with the new construction of a design center and vehicle review center. The nine existing buildings consisted of five that were constructed a little over 20 years ago and the remaining built approximately 10 years later. The mixture of these buildings made centralizing the campus’s operation systems a challenge. In addition to the scale and complexity of the project, ESD was faced with an aggressive 11-month schedule. Another challenge involved the signature building on campus. It includes a curved glass design feature on the fifth floor with extreme solar gain attributes. When the building was used by Alcatel-Lucent, the employees on the fifth floor used to have to wear shorts year-round. Navistar wanted to make certain its employees would have a consistent level of comfort on the fifth floor throughout the year.

Solutions

ESD’s solution to the aggressive schedule and complexity of the Navistar project was the utilization of multiple project teams. In order to provide the same level of consistency one project team would offer, ESD utilized an internal quality assurance team during the redevelopment and design. Along with internal coordination among the team managers, ESD frequently met with end-user groups and the owner’s representative in order to assure the construction of the appropriate specialty spaces. ESD engineered a control system upgrade and central building automation to tie all the construction together. To coordinate replacement of equipment, such as air handling units in small spaces, ESD utilized the 3-D modeling software, Revit. Regarding the signature building’s notorious fifth floor, computational fluid dynamics (CFD) and solar modeling were used to test shading and HVAC options to reduce solar gain and provide a comfortable, productive work environment. The solution developed by ESD has mitigated the solar gain heat issue so well that last summer, after anticipating greater solar gain, the building’s engineer received the first cold call from a fifth-floor occupant.

Existing solar traces in the fifth-floor perimeter are shown. Courtesy: ESD (Click to enlarge)This image shows the proposed solar traces in the fifth-floor perimeter. Courtesy: ESD (Click to enlarge)ESD made architectural modifications to the floor solar insolation.Courtesy: ESD (Click to enlarge)



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
Control Engineering Leaders Under 40 identifies and gives recognition to young engineers who...
Learn more about methods used to ensure that the integration between the safety system and the process control...
Adding industrial toughness and reliability to Ethernet eGuide
Technological advances like multiple-in-multiple-out (MIMO) transmitting and receiving
Virtualization advice: 4 ways splitting servers can help manufacturing; Efficient motion controls; Fill the brain drain; Learn from the HART Plant of the Year
Two sides to process safety: Combining human and technical factors in your program; Preparing HMI graphics for migrations; Mechatronics and safety; Engineers' Choice Awards
Detecting security breaches: Forensic invenstigations depend on knowing your networks inside and out; Wireless workers; Opening robotic control; Product exclusive: Robust encoders
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
News and comments from Control Engineering process industries editor, Peter Welander.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
Anthony Baker is a fictitious aggregation of experts from Callisto Integration, providing manufacturing consulting and systems integration.
Integrator Guide

Integrator Guide

Search the online Automation Integrator Guide
 

Create New Listing

Visit the System Integrators page to view past winners of Control Engineering's System Integrator of the Year Award and learn how to enter the competition. You will also find more information on system integrators and Control System Integrators Association.

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.