One step to a better maintenance plan

Before adopting a proactive maintenance culture, conduct an electrical system analysis

01/17/2012


Transitioning from a reactive “fix only what is broken” culture to creating a proactive routine preventive maintenance model is a long but sound business process. Before any maintenance program is initiated or contracted, it is strongly recommended that the facility’s management contract and commission the services of a licensed professional electrical engineer to perform short circuit analyses, a time/current coordination study, and an arc flash analysis, of the entire electrical power distribution system.

 

These studies will ensure that the existing electrical equipment is properly rated, set and labeled. There is wasted value in spending limited maintenance budget and resources to clean, maintain, and service electrical equipment that is later determined as needing to be replaced or removed from service.

 

In some circumstances, a Power System Risk Assessment is recommended prior to beginning a preventive maintenance program. The Risk Assessment can reveal safety concerns, poorly maintained equipment, as well as the negative affects of harsh environmental conditions as elevated temperature, moisture, dirt, polarized dust and other contaminates on electrical equipment.

 

A risk assessment provides valuable information concerning the “present state” of an electrical power distribution system and its associated equipment, its functionality, and reliability relative to the present needs of a facility’s operations. (Note: Business functions and operations change much faster than power distribution systems. A 20th century power distribution system might be inadequate to the needs and requirements of 21st century sensitive electronic loads.)

 

A key feature of a Power System Risk Assessment is the Hazard Vulnerability Analysis, which prioritizes the recommended corrective actions based upon safety and the criticality of a facility’s operations. A Power System Risk Assessment facilitates the development of a proposed maintenance schedule specific to a facility’s power distribution system. In addition, cost estimates are provided to help management develop a budget to carry-out the maintenance activities.

 

 

 

Fran Waterers full article on ‘Mintnance Contrats Can Improve Reliability, Safety' is one of the topics in Plant Engineering’s Forecast issue, which will be published in mid-February. To receive the digital edition of Plant Engineering in time for the Forecast issue, which also will feature the 2011 Plant Engineering Salary Survey, click here:



No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
Each year, a panel of Control Engineering editors and industry expert judges select the System Integrator of the Year Award winners.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Learn how to create value with re-use; gain productivity with lean automation and connectivity, and optimize panel design and construction.
Go deep: Automation tackles offshore oil challenges; Ethernet advice; Wireless robotics; Product exclusives; Digital edition exclusives
Lost in the gray scale? How to get effective HMIs; Best practices: Integrate old and new wireless systems; Smart software, networks; Service provider certifications
Fixing PID: Part 2: Tweaking controller strategy; Machine safety networks; Salary survey and career advice; Smart I/O architecture; Product exclusives
The Ask Control Engineering blog covers all aspects of automation, including motors, drives, sensors, motion control, machine control, and embedded systems.
Look at the basics of industrial wireless technologies, wireless concepts, wireless standards, and wireless best practices with Daniel E. Capano of Diversified Technical Services Inc.
Join this ongoing discussion of machine guarding topics, including solutions assessments, regulatory compliance, gap analysis...
This is a blog from the trenches – written by engineers who are implementing and upgrading control systems every day across every industry.
IMS Research, recently acquired by IHS Inc., is a leading independent supplier of market research and consultancy to the global electronics industry.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Case Study Database

Case Study Database

Get more exposure for your case study by uploading it to the Control Engineering case study database, where end-users can identify relevant solutions and explore what the experts are doing to effectively implement a variety of technology and productivity related projects.

These case studies provide examples of how knowledgeable solution providers have used technology, processes and people to create effective and successful implementations in real-world situations. Case studies can be completed by filling out a simple online form where you can outline the project title, abstract, and full story in 1500 words or less; upload photos, videos and a logo.

Click here to visit the Case Study Database and upload your case study.