Project: Baton Rouge Wastewater Pump Station SCADA System (April 12, 2006)

04/12/2006


April 12, 2006

This Monday we conducted the planned graphics review meeting with the City and its prime consultant. This meeting was to confirm acceptance of the SCADA screens and layout for the first booster station, prior to our proceeding with cutover of the remaining 12 stations.

It was reported that the existing SCADA system has stopped sending alarm messages completely, and that the City did not want to invest any time or money into the old system. This has given some renewed motivation to moving the booster stations onto the new SCADA system as soon as possible.

Largely, the City was happy with the graphics as presented. A suggestion was made by an operator to add the setpoint ranges to the screens next to the actual values. The pump station number needs to be displayed on all screens.

One of the prime consultant's engineers was participating in the meeting via a conference call. It was determined it would be best to arrange a separate meeting to address his concerns.





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Sensor-to-cloud interoperability; PID and digital control efficiency; Alarm management system design; Automotive industry advances
Make Big Data and Industrial Internet of Things work for you, 2017 Engineers' Choice Finalists, Avoid control design pitfalls, Managing IIoT processes
Engineering Leaders Under 40; System integration improving packaging operation; Process sensing; PID velocity; Cybersecurity and functional safety
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

SCADA at the junction, Managing risk through maintenance, Moving at the speed of data
Flexible offshore fire protection; Big Data's impact on operations; Bridging the skills gap; Identifying security risks
The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
click me