Project: Baton Rouge Wastewater Pump Station SCADA System (July 24, 2006)

07/25/2006


July 24, 2006

Although our engineering staff intended to convert 3 stations this week, multiple problems with the first conversion prevented this from occurring. An issue of the pumps not running because no lead pump was identified was resolved by a programming scheme to identify the lead pump. Then there was an issue with the RTU not accepting the MODBUS configuration. The unit had to be replaced and the old unit must be sent to the manufacturer for repair. We will attempt to convert the remaining 2 units from last week early this week.

Six new modem accounts were opened last week for the conversions of 6 more pumping stations. The modem setups are proceeding even smoother and with less technical support than in previous times.

The periodic monitoring of the existing modems still indicates that the transfer rate is acceptable.





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Motor specification guidelines; Understanding multivariable control; Improving a safety instrumented system; 2017 Engineers' Choice Award Winners
Selecting the best controller from several viewpoints; System integrator advice for the IIoT; TSN and real-time Ethernet; Questions to ask when selecting a VFD; Action items for an aging PLC/DCS
Robot advances in connectivity, collaboration, and programming; Advanced process control; Industrial wireless developments; Multiplatform system integration
Motion control advances and solutions can help with machine control, automated control on assembly lines, integration of robotics and automation, and machine safety.
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

Future of oil and gas projects; Reservoir models; The importance of SCADA to oil and gas
Big Data and bigger solutions; Tablet technologies; SCADA developments
SCADA at the junction, Managing risk through maintenance, Moving at the speed of data
Automation Engineer; Wood Group
System Integrator; Cross Integrated Systems Group
Jose S. Vasquez, Jr.
Fire & Life Safety Engineer; Technip USA Inc.
click me