Project: Baton Rouge Wastewater Pump Station SCADA System (November 29, 2005)

11/29/2005


November 29, 2005

With a short work week last week, we focused on moving things along with Phase I of the project. We made a request to the primary engineering consultant to add a vendor to the Phase I RTU and HMI solicitation. In our September meeting, we agreed with the client and consultant that an Ethernet vs. Modbus architecture would be preferred. This decision is pointing us toward some considerably different hardware and software.

We have experience building systems using every PLC and specialty pump controller product the city has ever considered. Based on our experience, we chose to do our own RTU/HMI evaluation and tested the most promising products with our system, so as not to find ourselves without a solution that both we and the client could live with. The testing demonstrated our chosen solution offers considerably more functionality for the customer than specified, at about the same price level. It will be interesting to see how the primary consultant's evaluation compares to our own.





No comments
The Engineers' Choice Awards highlight some of the best new control, instrumentation and automation products as chosen by...
The System Integrator Giants program lists the top 100 system integrators among companies listed in CFE Media's Global System Integrator Database.
The Engineering Leaders Under 40 program identifies and gives recognition to young engineers who...
This eGuide illustrates solutions, applications and benefits of machine vision systems.
Learn how to increase device reliability in harsh environments and decrease unplanned system downtime.
This eGuide contains a series of articles and videos that considers theoretical and practical; immediate needs and a look into the future.
Additive manufacturing advancements; Machine vision enhances robotics; Fieldbus evolution; Process safety; Advice from System Integrators of the Year; Road to IANA
Salary and career survey: Benchmarks and advice; Designing controls; Remote data collection, historians; Control valve advances; Hannover Messe; Control Engineering International
System integration: Best practices and technologies to help; Virtualization virtues; Cyber security advice; Motor system efficiency, savings; Product exclusives; Road to Hannover
This article collection contains several articles on the Industrial Internet of Things (IIoT) and how it is transforming manufacturing.
PLCs, robots, and the quest for a single controller; how OEE is key to automation solutions.

Find and connect with the most suitable service provider for your unique application. Start searching the Global System Integrator Database Now!

The digital oilfield: Utilizing Big Data can yield big savings; Virtualization a real solution; Tracking SIS performance
Getting to the bottom of subsea repairs: Older pipelines need more attention, and operators need a repair strategy; OTC preview; Offshore production difficult - and crucial
Digital oilfields: Integrated HMI/SCADA systems enable smarter data acquisition; Real-world impact of simulation; Electric actuator technology prospers in production fields
click me